Where does the house need waterproofing?
1, toilet
The bathroom wall and floor, the bathroom belongs to the water-intensive area, so it must be waterproof, and the wall should be about 2.4m to prevent water leakage and other related problems. If the bathroom is a second-hand house decoration, it is recommended that the self-built wall be waterproof to the top; It is best to use ceramsite and fly ash for toilet backfill, which is light in weight and good in water absorption, and do not use construction waste and soil.
Step 2: Kitchen
Kitchen waterproofing is mainly floor drain, floor and wall treatment.
3. Balcony
Balcony, especially open balcony, must be waterproof and drainage, because rain may float in to avoid water seepage, causing neighborhood disputes and maintenance troubles. If it is a closed balcony, it is recommended to be waterproof if you hang some clothes at ordinary times.
Extended data:
Selection of waterproof materials:
At present, there are two kinds of home improvement waterproof materials on the market: one is modified asphalt waterproof coating and glass fiber cloth, which can improve strength and flexibility. Using this kind of coating, the waterproof project is more complicated, but the price is not high, about 0/00 yuan per square meter/kloc.
The other is polyurethane waterproof coating, which is an advanced waterproof coating mainly based on polymer coating at present. This kind of coating has good waterproof effect, but its price is higher. The price per square meter is about 140 yuan. The two materials have their own advantages and disadvantages, and how to choose them should be considered according to the actual situation of the owners.
After the waterproof construction steps are completed, it is necessary to carry out a closed water test. Only through the closed water test can the waterproof layer really play its role. Closed water test is an important work of waterproof inspection. For the original waterproof layer, through the closed water test, we can know whether the waterproof layer is in good condition and whether it needs to be redone.
The newly made waterproof layer can be used to check whether the waterproof construction is qualified. 36 hours after the waterproof construction is completed, the closed water test shall be conducted, and the drainage height of the ground shall be subject to the waterproof coating without wall root, pipe heel and ground protrusion.