China Naming Network - Baby naming - What is a technical tender?
What is a technical tender?
Technical tender refers to \x0d\ 1, the response to the substantive requirements and conditions put forward in the tender documents, construction organization design or scheme, and the commitment to the special technical contents in the tender documents. \x0d\2。 Technical bid can be evaluated by means of dark bid, and the specific preparation method of dark bid should be specified in the tender documents. For larger projects, the registered construction engineer who bids may be required to conduct on-site defense on related issues of technical targets. \x0d\x0d\ Main problems of technical bid \ x0d \ In bidding, the commercial bid is access, the economic bid is shortlisted, and the technical bid is the last link of bidding. The technical bidding problem is: \ x0d \ 1. Packaging and content: At present, we pay attention to packaging, appearance and mode, but the frequent problem is that packaging is very particular, but \ x0d \ 2. Rejected bid in the hidden bid: the construction organization design is generally a hidden bid, but some packages and models do not meet the unified requirements of the bidding documents, or some details have the characteristics of the enterprise, which leads to the rejection of the bid. \ x0d \ 3。 Summary: The construction organization design pays attention to the mode and terms, and the application of technology and specifications is detailed and complete, but it is not combined with the actual situation of the project and loses its pertinence. Some enterprises have passed the quality certification and environmental protection certification, but no specific organizational measures have been formulated for related projects. \ x0d \ 4。 Improper selection of standards: the existing engineering quality standards should be used and cannot be extended. For example, the "Beijing Advanced Building Decoration Engineering Quality Acceptance Standard" revoked in 2002 can no longer be used. However, some enterprises have put it forward in the construction organization design, and some even use high-quality projects instead of standards. \ x0d \ 5。 Poor feasibility: Architectural decoration engineering involves structure, basement, water, electricity, wind, fire protection, intelligence and so on. However, only the decoration part is arranged in the construction progress, which ignores the cross-connection with many professions and subcontractors and lacks overall coordination. \ x0d \ 6。 Short and moderate: some construction organization designs are very long, which generally reflect a lot of things, but they bypass the relevant key points, avoid the heavy and ignore the key links, such as the project is catching up with the rainy season or winter, but there are no specific measures in the construction organization design. No project can be separated from electricity, but electricity consumption, lighting electricity consumption, peacetime electricity consumption and peak electricity consumption can not be reflected by a construction organization design.