Matters needing attention in installation of floor heating main pipe and water separator

This paper will introduce the matters needing attention in the installation of floor heating main pipe and water separator to help readers better understand the installation of floor heating.

♂? Supervisor installation

The installation of the supervisor must be carried out at the position indicated in the design drawings, and there must be no error; The supervisor must do heat preservation; The main pipe shall be installed horizontally and vertically; Supervisors shall be fixed firmly with pipe clamps; After the installation is completed, the supervisor shall carry out inhibition test.

Installation of water separator

The water separator should be installed horizontally; Wipe the oil-water separator clean after installation; Pay attention to the connection of water supply and backwater; After installing the water separator, it is necessary to mark the heating area of each circuit.