What should the earth excavation builder do?
2, intends to arrange their own team construction tasks according to the monthly schedule, and is responsible for the on-site technical disclosure of the teams or labor teams under their jurisdiction. Be responsible for project quality, progress, cost and civilized construction on site. ?
3, do a good job in the reasonable arrangement of labor, materials, machinery and equipment in charge of the work, fully mobilize the enthusiasm of team members, implement engineering quality and safety assurance measures, firmly establish the guiding ideology of prevention first and control in advance, comprehensively check, guide and ensure the quality of key projects and concealed projects in construction.
earthwork
In civil engineering, common earthworks include: site leveling, foundation pit (trench) and trench excavation, subgrade excavation, civil air defense engineering excavation, ground filling, subgrade filling and foundation pit backfilling. To arrange the construction plan reasonably, try not to arrange it in the rainy season.
At the same time, in order to reduce the construction cost of earthwork and implement the principle of not occupying or occupying less cultivated land and being beneficial to land reclamation, it is necessary to formulate a reasonable earthwork allocation plan and make overall arrangements.