Making weather paper
1. Change the design table
2. Change the drawing
3. Project completion drawing
(2) Project management documents
(3) Construction quality control documents
1, engineering quality document
A, project quality documents
B, project quality self-inspection report and project quality inspection and evaluation data;
C, safety and quality accidents and handling reports, as well as supporting documents for remedial requirements;
D, foundation strength and integrity inspection data;
E, construction records, case handling records, construction technology, quality inspection records and observation records, as well as project quality impact analysis;
F, the completion acceptance test, testing and evaluation data of the construction unit.
2, test, test report
A, all kinds of raw materials test report;
B, concrete, mortar mixture ratio test report;
C sampling and test data of raw materials, purchased goods and semi-finished products;
D, purchased materials (products) certificate and inspection report, quality appraisal report;
E, mechanical and electrical equipment, monitoring equipment product certificate, test and debugging records.
3, the original construction data
A, various sign production, installation and inspection records;
B, marking inspection data and construction records;
C. Construction and inspection data of anti-collision guardrail, isolation guardrail and ancillary facilities;
D, lighting system construction, testing data;
E, testing data of each link;
F, product inspection data 4, defect liability period data
(4) Construction safety and civilized construction documents
1, security license file
2, safety accident investigation and handling documents
3, civilized construction documents
(5) schedule control documents
1, attached table (documents and charts), approval document
2, the implementation progress (documents, charts)
3. Close the progress file
(6) Measurement and payment documents
(7) Contract management documents
(8) Original records of construction
1, construction record
2. Records of gases, temperatures and their own disasters
3, measuring the original records,
4. Original construction records of each working procedure (not imported into the construction quality control document department)
5, meeting records, minutes
6, construction photos, audio-visual materials
7. Its original records know the content. Is the landlord clear for you? I wonder if you are satisfied. Please adopt it. Thank you.