China Naming Network - Eight-character Q&A - What list quota does the slope cover?
What list quota does the slope cover?
Ramp list quota needs to be set:
1, with plain soil cushion on the ground.
2, set the gravel cushion.
3. Set the 80-thick fine stone concrete floor and calculate the quantity of external formwork.
When you play, the floor of the building is plastered.
5. A set of embedded iron pieces.
6. Length of stainless steel railing.
7. A set of stainless steel elbows.