It's hot and rainy in summer, how to build high-quality projects in formwork construction?
2. Concrete should be poured as soon as possible after the template is assembled to prevent the template from being deformed in the sun and rain. If the formwork cannot be poured in time after assembly and gets wet by rain, recheck it before pouring concrete to reinforce the formwork and support.
3. Formwork and components: The stacking area should be hardened and firmly inserted. Before pouring concrete in rainy days, carefully check the formwork and support to prevent the formwork support from loosening.
The weather in the north is dry. At this point, the construction of building formwork should try to avoid the sun exposure at noon. Before pouring concrete, it is suggested to water the building formwork to reduce the probability of warping deformation.