China Naming Network - Eight-character Q&A - What projects are under construction in Nanchong, Sichuan?

What projects are under construction in Nanchong, Sichuan?

Fengyichang Navigation and Power Junction Project is the first 10 of the 6 steps of power generation and comprehensive development to improve shipping in Guangyuan-Chongqing section of Jialing River, 23 kilometers away from Nanchong City. The upstream is connected with the tail water of Ma Hui Power Station, and the downstream is connected with the Xiaolongmen Navigation and Power Hub project which has started construction. This project is a key water conservancy project focusing on power generation and shipping development, and comprehensive utilization of irrigation and tourism. The normal water level of the reservoir is 280m, the total installed capacity of the power station is 84MW, the guaranteed output is 23.5MW, and the annual power generation is 385.4 million kW? H the navigable tonnage of the dam is 2×500t, and that of canalized waterway is 24km.

The main structures of the hub project include the riverbed power station on the left bank, the middle flood discharge sluice, the lock on the right bank and the dam sections on the left and right banks. The total length of the dam crest is 657. 18m, and the maximum dam height is 39m. The construction period of the first machine is 37 months, with a total construction period of 5 1 month.

The main body of Fengyichang Aeronautical Power Project is scheduled to start at 438+0 on June 5, 2007. According to the project schedule and the owner's requirements, the construction period of the main control nodes of this project is as follows: the construction of roads, wind, water, electricity, production and living facilities is planned to be completed on June 5438+0, 2007, the first phase of large foundation pit cofferdam will be formed at the end of 2007, and the small foundation pit cofferdam of the factory building will be completed on June 5438+0, 2008.