Garden construction site internship report
Dear, do you know how to write an internship report? The following is the "Garden Construction Site Internship Report" carefully compiled by me for everyone. More excellent articles are available. You are welcome to read them. The content is for reference only. I hope it will be helpful to you! Garden construction site internship report 1
Since the reform and opening up, all aspects of my country’s gardening industry, from seedling breeding, seedling production, garden design, and garden engineering construction, have made great progress. development, but the xx garden project only entered the full implementation stage in xx. There are still some problems, which can be summarized as follows:
Through two months of work at xx Garden Co., Ltd. I learned a lot about this position during the internship! Now it is summarized as follows:
1. Practical content:
Strict control of construction quality is the prerequisite for good supervision work.
“A century-old plan, quality first” is the consistent policy of my country’s engineering construction. Project quality is related to the effects of production and use, and to the safety of people's lives and property. Therefore, ensuring project quality is an important part of the project. The factors that affect the construction quality of garden projects mainly include: garden project construction personnel, garden plant materials and components, garden construction machinery and environmental factors. This determines that supervisors must try to make the people, machines, materials and methods that affect the quality of the project work. , environment and other factors are under comprehensive control to achieve the quality control objectives of supervision, thus promoting the smooth development of supervision work. To monitor the construction quality of garden projects, we should mainly focus on the following aspects:
1. Supervise construction units to choose fertile, loose, and well-drained planting soil.
For example: camellia, rhododendron, azalea, rhododendron, camphor, and heather prefer acidic soil, while chrysanthemums, cypresses, and pomegranates prefer alkaline soil. During the planting process, only the plants’ Only when the ecological requirements and the ecological characteristics of the soil are unified can the plants grow well. It can be seen that the supervisors must urge the construction workers to replace the soil or improve the soil in a targeted manner during the supervision process to ensure the continuity of the normal growth of the plants. At the same time, it can also reduce the economic losses of the construction unit and avoid damage to the urban landscape.
2. Strictly control plant materials to ensure the construction quality of the project.
The supervision engineer should urge the construction unit to purchase seedlings according to the design drawings, and check the name, specifications, quantity, origin and seedling quarantine form of the seedlings before they enter the site, and reject any seedlings that do not meet the specifications. . The quality of plant materials, in addition to meeting the design requirements, must also meet the quality requirements in Table 1 and Table 2:
3. It is recommended that owners and construction units choose a suitable planting season to increase the survival rate of seedlings. Save project costs
The planting season of plants should be selected during the period suitable for root growth and the minimum transpiration of branches and leaves. Generally, the dormant period after leaf fall and before budding in spring is most suitable. However, with the continuous expansion of green area , With the continuous increase of projects, the off-season planting of seedlings has become a more common phenomenon. For this reason, supervisors must take good care of the off-season planting of seedlings.
4. Monitoring the construction quality of the steel and wood structures in garden paths and garden sketches is also one of the key points to ensure the quality of garden projects.
Garden roads are routes that must be passed by vehicles and tourists. Generally, they can be divided according to their uses: garden roads (more than 6 meters) that are mainly used for vehicles and paid by walking (more than 6 meters), and park roads that are mainly used for walking and walking (greater than 3 meters but less than 6 meters), garden roads completely for walking (less than 3 meters): According to the pavement materials, common marble pavements, concrete pavements, grass-embedded lawn pavements, pebble pavements, etc.
Garden projects generally include steel-wood structure projects such as pavilions, corridors, flower stands, steel-wood structure combinations, etc. During their production, installation, and wooden door and window production projects, supervisors should know the species and material of the wood in advance. , moisture content, anti-corrosion, insect-proof, fire-proof and the materials, models and specifications of steel and accessories used in steel-wood structures shall be monitored first, and those that do not meet the design requirements and construction specifications shall not be used.
Since all important aspects of supervision work are inseparable from the necessary procedure of "signature", in the actual operation process, there are defects such as irregular signature forms and arbitrary signatures of supervisors; some Signing forms are used indiscriminately. Some supervision engineers serve as directors of several projects and often sign in confusion without fully understanding the project; other supervision personnel ask for "control of project investment" It has become an empty talk. For this reason, supervisors should pay attention to "signature" during the supervision process:
1. The responsibilities should be clear, and what documents should be signed, what documents should not be signed, and when they can be signed. When can't you sign? When supervising garden projects, you should remember that only the director has the authority to sign any legal documents, economic documents, start-up reports, and shutdown reports, otherwise he will be responsible for all the legal consequences.
2. Signatures must be treated with caution. Supervisors must sign the documents and information in their hands in a timely, accurate, objective and fair manner, especially information related to project quantities. This requires supervisors to master first-hand data during the construction process - project quantities. Only in this way can the accuracy of project measurement be ensured, the investment be controlled to achieve the expected results, and the interests of the construction unit and the legitimate economic interests of the contractor be safeguarded. Benefit.
3. Do not sign on behalf of others rashly, and do not easily entrust others to sign on your behalf.
2. Practical results
Good coordination with the owners is an important guarantee for the smooth implementation of the supervision work.
Since the garden project construction supervision system has not been fully implemented for a long time, owners have little knowledge of the supervision system, supervision procedures, etc. Some owners have implemented supervision due to the rigid regulations of the construction department, but in fact they have not There is no real delegation of authority to the supervisory party, resulting in the passivity of supervision work.
In view of this situation, as a supervisor, you must use your own efforts to enhance the owner's understanding and support for the supervision work. First of all, the supervision engineer must understand the overall goal of the project and the real intention of the owner. Due to the imperfect supervision system, the current supervisor only participates in supervision during the construction stage and cannot participate in the decision-making process of the project, resulting in the management of the entire project failing to achieve the expected goals. For this reason, the supervision engineer must communicate with the owner in a timely manner before the start of construction. , understand the owner's intentions for the project, so as to lay the foundation for future supervision work.
Carry out the work carefully and carefully, especially supervise the implementation of some hidden projects. If problems are found, report them to the owner in a timely manner and make more reports so that the owner can fully understand the construction status of the entire project in a timely manner; in addition, as a professional During the construction process, the supervision engineer should try his best to provide the owner with some suggestions that are beneficial, rational, practical and easy to implement for the project construction. For example, during the supervision process of the Ducheng Eco Village project, our supervisors raised questions about the plant configuration in the design drawings.
Because the geographical environment of Ducheng Eco-Village is relatively special. The eco-village is adjacent to the Hangzhou Steel Plant to the east and the Banshan Power Plant to the west. The pollution is extremely serious. Plants such as cedar and metasequoia are relatively resistant to toxic gases such as SO2 and CO2. Poor, it cannot play a big role in improving the environment. For this reason, we recommend using Ailanthus ailanthus, Magnolia grandiflorum, Ginkgo biloba, juniper, Italian poplar and other seedlings. This will not affect the overall landscape but at the same time improve the local microclimate and reduce air pollution. Played a big role. More importantly, this move has been recognized and supported by the owners, which has given them a new understanding of the role of supervision in project construction, and has played a positive role in the smooth development of supervision work.
3. Practical summary or experience
Only by continuously improving the level of supervision services, continuously deepening the service connotation of supervision, ensuring the construction quality of the project, and reasonably controlling the project cost can supervisory personnel make the project more effective. Only when garden supervision work can be carried out smoothly can the healthy development of the garden industry be promoted. Gardening Construction Site Internship Report 2
I learned that xx Landscaping Co., Ltd. was recruiting interns from an alumnus. After I submitted my resume, I received a call from manager xx informing me of the interview on the 15th. A little happy, a little calm.
I arrived at the xx Garden Company as scheduled. Manager xx received me and conducted an interview in the conference room on the 16th floor.
Manager xx asked me about my basic situation, and I answered them one by one. Then Manager Ouyang made some comments on my resume, and then asked me about my plans after joining the company, and I answered them one by one. Some questions were not answered well, and Manager xx also pointed them out to me one by one.
It is true that my self-confidence has been hit a lot, but when manager xx talked to me about the treatment issue, I knew something was coming. I will go back to work at the company on the 19th. The internship period is one month!
Today is xx, month xx, xxxx. It was my first time to go to work in xx Garden. A little nervous, a little calm, thinking about what today's work will be. When we arrived at xx Garden, Manager xx hadn’t come back yet. So I went to the Human Resources Department on the 17th floor to report. After preparing the materials, the head of the human resources department asked me to study the company's information on the computer in the study area. He also personally helped me retrieve the information and gave me the employee training form. After thanking you, I started browsing. I think this computer in the study area will be with me in the next month.
In the afternoon, manager xx arranged for me to follow supervisor xx to Nansha. We came to the construction site of xxx Yujing, where we maintained all the indoor and outdoor plants. Uncle Li said that what needs to be solved today is the water problem of the scenic spots outside the model house, and the indoor plants need to be replaced at the request of Party A. So under the leadership of Uncle Li, I gradually became familiar with the placement and types of plants in several model houses. I also gradually began to get to know the golden-heart Brazilian iron, the green treasure tree, the five-pole money tree, etc. Uncle Li also told me to find out why this type of plant is placed in this location and what is the purpose of placing this plant. For example, there are several sageflower trees placed near the window. Their lush branches and leaves are relatively large, which can effectively block the construction outside the window and prevent customers who visit the model building from seeing it.
There are also money trees placed in offices that are related to Feng Shui. So don’t just see a plant placed here. In fact, it involves thinking about many aspects, such as Feng Shui, maintenance, Party A’s requirements, etc. Uncle Li said that if you want to do a good job in this area, you need to learn a variety of knowledge to do it well. After listening to what Uncle Li taught me, I realized that this is not easy, but I believe I can do it.
As for the water problem, Uncle Li solved it by asking the person in charge of water and electricity. Communicating with the relevant person in charge is also a very important course!
Today is the first day of work in xx company.
Today I met Uncle Li, a supervisor who is easy to get along with, serious and responsible at work. In the future, I will follow Uncle Li to learn about rental and maintenance.
Today I returned to the construction site, saw the construction site, the workers working on the construction site, the large hook machine, and the yellow, white, and red safety helmets. Everything was so familiar.
When I arrived at the company in the morning, I went straight to the computer in the study area on the xx floor. Uncle Li arranged to go to Xincheng Yujing today. I believe you should be in the study area before departure. The company shoots a lot of videos, and I can learn about the company's corporate culture by watching the videos.
We set off around xx o'clock. There was another person today, and I later found out that he was the vice president. It seems there is something else going on. Sure enough, we have to go to the site with Party A, the project manager, and the person in charge of the greening construction to handle the handover. It turns out we have to take it over for maintenance. A group of us walked through the areas where our company was required to maintain them. Party A asked the person in charge of the greening construction to re-pave the turf and bags of seedlings in several places so that our company could take over.
Party A also asked for pruning of several plants, and xx always agreed. This is our responsibility. When we arrived at the balcony garden on the third floor of the community, Mr. xx asked about the location of the green water, whether the water pressure was high enough, etc. I learned another lesson.
The one-month internship ended quietly in the blink of an eye. I learned a lot through working at xx Garden Company! Through production internships, I learned and understood the knowledge of flower cultivation, maintenance and management, and cultivated my Establishing a work style that integrates theory with practice has laid a solid foundation for subsequent professional course learning, curriculum design and graduation projects. Through production internships, students broaden their knowledge, increase their perceptual cognition, organize and systematize the knowledge they have learned, learn professional knowledge that cannot be learned from books, and obtain the latest information on the domestic and technological development status of this major. , stimulate students' enthusiasm for practical learning and exploration, and lay a solid foundation for future study and technical work they will engage in. Garden Construction Site Internship Report 3
This is the first time I have officially integrated into society and set foot on the job, and started a completely different life from the past. Commute to and from get off work at the specified time every day. During work, you must complete your work tasks carefully and on time, and you must not be hasty and perfunctory. The purpose of on-the-job internship is to further improve students' ability to understand society and adapt to work after graduation, and to make necessary preparations for graduation. By completing the design of practical projects and carrying out construction management of projects, students can cultivate and improve their ability to understand society and adapt to practical work. ability.
Through this internship, I personally appreciated many different landscapes, felt the different visual enjoyment that different landscapes brought to us, and also realized the artistic techniques and techniques that should be followed in different landscape designs. in principle. This internship made me realize the charm of "landscape design", and it also made me understand the importance of learning theoretical knowledge. It also greatly stimulated my interest in learning. As the saying goes: One or two years of work is better than more than ten years of study. Therefore, this off-campus internship has a very good internship effect.
My unit is xx company. From the day I entered the company for internship, I felt that the company and school teaching were completely different. During this internship, I also realized the importance of professional knowledge and broadening my horizons. I discovered that I have many shortcomings, and I understand that design requires persistence in learning and continuous innovation. With the careful care and help of my brothers and sisters, I have deepened my understanding of the original book knowledge and gained a better understanding of knowledge that I have never been exposed to. I think this will be a precious experience in my life, and it will also leave wonderful and unforgettable memories for my youth.
With the training of various large and small projects, I have stored a lot of useful reference materials in my computer, including plans, construction drawings, renderings, etc., but more importantly, I I have accumulated a lot of experience, which is a very valuable asset. No matter whether I change my career in the future, these are precious memories in my life.
My professional direction is landscaping design. My job responsibilities are to be able to independently complete the planning and design of small garden planning and design projects, and to assist designers in completing the preliminary design and construction drawing design of large and medium-sized garden planning and design projects. . This requires me to use the professional theoretical knowledge and practical skills I have learned to independently and standardizedly complete all drawings, text descriptions and text production from the schematic design to the construction drawing design of the garden planning and design project, and to be able to correctly express the design intention. Can assist the designers of the internship unit to complete the data collection, analysis and organization of large and medium-sized garden planning and design projects, and help complete the preliminary design, construction drawing design and text production. This is my internship goal and I hope I can achieve it after graduation.
During this half-year internship, I learned a lot, whether it is life or work. I also broadened my horizons, increased my knowledge, experienced the cruelty of social competition, and more importantly, I hope that I will succeed in the future. Accumulate experience in various aspects at work to prepare for the path you will take in the future. When I am busiest, I can draw until after 2 o'clock at night and still continue to work hard the next day. When I have free time, I can do nothing for several days. In addition, I still have many shortcomings. For example: lack of practical experience, lack of mastery of standards in related industries, etc.
So I often remind myself not to be afraid of hardship and fatigue, and to strengthen practice while mastering solid theoretical knowledge, so as to integrate theory with practice.
My boss also told me about the shortcomings of slow speed before. I went back and thought about it, and found that it was my attitude problem. I didn't realize the urgency of time and put off many things. But design is not up to us. What is the problem? They should all be done early. Now, I will no longer procrastinate. My foundation is not good, but I believe that hard work can make up for weakness. After a period of time, my professional knowledge will not be worse than others.
In this era of information explosion, knowledge is updated too fast, and it is definitely not enough to rely on the original knowledge. We must be diligent in our work, think slowly, and keep learning and accumulating. When you encounter something you don't understand, you should first find ways to solve it yourself. If you really can't do it, you can humbly ask others for advice. People who don't have the ability to learn on their own will sooner or later be eliminated by enterprises and society. Internship is the beginning and the end. What lay before him was a fertile land for him to ride on, and he clearly felt the heavy responsibility. In my future work and life, I will continue to learn, practice in depth, constantly improve myself, strive to create performance, and continue to create more value for the unit and the country.