In life, we may all use notices, which can be divided into different categories according to the different scope of application. Then the question is coming, how should I write an appropriate notice? The following is my collection of flood control safety instructions for enterprises (6 in total). Welcome to reading. I hope you will like them.

Enterprise flood control safety notice 1 All units, cadres, workers and their families:

When the rainy season comes, in order to do a good job in flood control and prevention of geological disasters, and safeguard and guarantee the safety of people's lives and property, combined with the actual situation of our field, the experimental field has formulated the "20xx Flood Control Work Plan for Teaching Experimental Field of China Agricultural University", which is hereby issued, please follow it.

After receiving this notice, all units must conscientiously do a good job in the investigation and rectification of hidden dangers of flood control; Improve all kinds of flood prevention plans and work plans; Do a good job in the prevention and control of geological disasters in key areas; Do a good job in preventive measures for key parts such as family areas, especially the living areas of bungalows; Do a good job in emergency material reserves and emergency team building to further enhance flood control and emergency response capabilities; Once the disaster is found and reported in time, it is not allowed to report it late; All units should strengthen leadership, fully implement the flood control responsibility system, strictly implement the 24-hour duty and leadership shift system, be strict in discipline, and obey orders.

When the rainy season comes, it is suggested that all cadres, workers and their families minimize going out and actively take protective measures to ensure the safety of daily production, life and personal travel; Pay attention to the slippery road surface to ensure traffic safety; Family members of workers living in bungalows should do a good job in housing safety prevention; Pay attention to lightning protection when traveling in thunderstorm weather; Be sure to watch your step when you go out. If you find the rain spinning, please make a detour. Try not to get close to the lamppost to prevent electric leakage and electric shock.

Notice on flood control safety of enterprises. Branch, Project Management Department and all departments of the company:

The recent continuous large-scale rainfall has caused many natural disasters such as floods and mudslides, which seriously threatened the safety of the construction site, personnel and equipment. On July 4th, 1 person died in the third bid section of the highway reconstruction project in Leibo reservoir area of Xiluodu Hydropower Station due to the landslide caused by heavy rainfall. In order to put an end to such safety accidents and ensure personal and property safety, the notice on strengthening flood control and flood fighting safety at the construction site is as follows:

First, strengthen leadership and strengthen awareness of prevention.

All subsidiaries, project managers (project managers), chief engineers of project management departments and heads of security departments must attach great importance to flood control, flood control and safety work. It is necessary to firmly establish the idea of preparedness, study and solve the problems existing in the flood control work of this project and this area in time, improve the flood control system in a targeted manner, establish an inspection mechanism, and conduct key inspections on key departments and key parts such as the mouth of the cave, high slope of subgrade, deep cutting, half-filled and half-dug embankment, deep foundation pit, bridge water equipment, materials, warehouses and construction site. , and check the poor drainage, and whether there is any change in the mountain, prominent and prominent. It is necessary to carry out emergency rescue drills and publicity and education on flood control and flood fighting, strengthen employees' awareness of safety in production, ensure that all flood control measures are put in place, and do a solid job in flood control and flood fighting safety.

Second, improve institutions and implement flood control responsibilities.

The Company has established the "Safety Leading Group for Flood Control and Flood Fighting of Highway Tunnel Group Engineering Co., Ltd." with Jiang Wangang, the executive deputy general manager, Zeng Minying, the manager of administrative department, Li Xiaobin, the manager of business development department, Zhu Ling, the manager of financial assets department and Chen Xihan, the engineering department as members, and the office is located in the project management (engineering) department. Chen Xihan is in charge of daily work.

Each subsidiary and project management department must set up a leading group for flood control and flood fighting, with the main project leader as the team leader, the chief engineer and production leader as the deputy team leader, and the heads of departments and teams as members. The main responsibilities are: to understand the weather forecast and take effective measures to deal with floods and geological disasters; Formulate flood control management system and emergency rescue plan, organize the implementation of emergency rescue and disaster relief in case of disaster, and report to the head office and local government quickly.

Third, eliminate hidden dangers and establish an emergency mechanism:

All construction departments should strictly follow the requirements of "Building Law", "Building Construction Safety Inspection Standard" and other laws, regulations and standards, and reasonably arrange construction progress and procedures according to weather and climate changes to ensure construction safety. Supervise and inspect major, large and general hazards within the jurisdiction, especially major hazards such as explosives depots, oil depots, aerial work, high slopes and deep foundation pits, strictly implement special plans and operating procedures, assign special personnel to be on duty when necessary, establish perfect hazard observation records, and prevent injury accidents such as explosion, fire, falling from high altitude, burial and object strike. Investigate the hidden dangers of major hazards such as temporary power lines, mixing stations, prefabrication yards and steel bar processing yards to prevent lightning strikes, electric shocks and other injuries. If hidden dangers are found, we should urge thorough rectification and leave no dead ends. It is necessary to strengthen the management of general hazards such as operating personnel, mechanical equipment, transportation equipment, etc., improve the personnel and equipment management system, and prohibit bathing, washing, playing and other operations in the river to prevent drowning, property loss and other injuries.

Four, the establishment of emergency rescue mechanism to deal with emergencies:

Each subsidiary and the leading group for flood control work of the project management department shall establish an emergency rescue mechanism for flood control and flood fighting, and formulate and improve the emergency rescue plan for flood control and flood fighting. It is necessary to regularly discuss, revise and drill the plan, and conduct professional training for emergency personnel; Implement rescue teams and materials, such as sacks, shovels, life jackets, lifebuoys, safety ropes and safety belts; It is necessary to ensure the smooth flow of information at any time, improve the actual combat ability, rush to the scene in the shortest time in case of danger, scientifically organize emergency rescue, and ensure effective prevention and timely rescue.

Verb (abbreviation of verb) ensures coordination and communication of safety production;

Before the flood season comes, all subsidiaries and project management departments should strengthen coordination and communication with the government, owners and supervision departments, and obey unified management and command; Keep in touch with local departments of fire control, public security, medical treatment and meteorology, designate special personnel to be responsible for communication, ensure accurate, timely and smooth rescue and relief work, strengthen on-site safety management, and prevent breeding disasters.

Notice on flood control safety of enterprises 3. All companies and departments:

The flood season of 20xx has arrived. In order to ensure the safety of mining enterprises, ground enterprises and other units of the Group, the leaders of the Group have made the following arrangements for the safety of the Group in 20xx:

The first is to set up a leading group for flood control and fighting. The person in charge of each unit is the first responsible person, so we must attach great importance to flood control and set up a flood control and rescue commando. There should be a sound organization, clear responsibilities and tasks, and orderly command. The telephone number of personnel on duty in key positions should be kept open for 24 hours, pay attention to the weather forecast, report problems in time and handle them properly, especially in the case of abnormal weather such as strong wind, heavy rain and high temperature, and do a good job in disaster prevention and relief to ensure the safety of the Group in flood season.

Second, formulate emergency plans for flood control and fighting. All units shall, according to the experience of flood control and flood fighting in previous years and combined with the actual production situation this year, formulate the 20xx emergency plan for flood control and flood fighting, and make careful arrangements for all the work in flood season, so as to plan, arrange and prepare early to ensure foolproof.

Third, implement flood control materials. All units should prepare enough wires, woven bags, shovels, purses, raincoats, rain boots, flashlights and other materials.

4 enterprise flood control safety notice each construction project department:

According to the latest weather forecast issued by the Inner Mongolia Meteorological Bureau, our city will face heavy rain and heavy rain, which will easily lead to natural disasters. In order to ensure the absolute safety of personnel and property of our project management department, ensure the safety and smooth progress of the project, make the project pass the flood season smoothly, and minimize the impact of the rainy season on the construction. According to the requirements of the higher authorities, the project manager department is required to make specific arrangements for flood control and fighting in rainy season:

First of all, the project department is required to set up a leading group for flood control, which is responsible for organizing the overall work of flood control.

The office of the leading group for flood control and flood fighting command is located in the security department of the project department. The security officer of the security department is responsible for collecting the daily weather forecast information and informing the members of the flood control team of the weather forecast. When the higher authorities release flood warning information, they shall coordinate the relevant departments and units to do a good job in flood warning and response, and implement the relevant flood control emergency measures of the higher authorities.

The second is to highlight key points and intensify efforts to eliminate dangerous situations.

It is required that all construction project departments must attach great importance to it, strictly strengthen the prevention work, quickly check the disaster-prone points one by one, find out the situation on the construction site, and focus on the work of eliminating risks. To grasp the key points:

1, the parking position of large mechanical equipment should be reinforced;

2, the site drainage system dredge;

3, site materials, temporary electricity should be covered.

Three, strengthen the responsibility, adhere to the duty inspection system. Flood control leaders of each project department

The team should strictly implement the day and night duty system, and adhere to the 24-hour on-site inspection duty system in rainy season and flood season. Team members shall stick to their posts, and shall not leave their posts without authorization. They shall be vigilant at any time, observe carefully, especially pay close attention to dangerous areas, and immediately report possible dangers to the project manager department. In view of extreme weather changes, do a good job of "before rain, during rain and after rain" inspection. In case of danger, start the emergency plan quickly, organize emergency rescue immediately, prevent the accident from expanding, minimize losses, and ensure the personal safety and property safety of personnel.

Fourth, acquire flood control facilities and prepare emergency materials for flood control.

On the premise of ensuring the smooth progress of flood control, each project department should give priority to prevention, prepare sufficient flood control materials and equipment, ensure the timely supply of flood control materials, and educate all personnel on flood control and flood control safety to make them realize the importance and harm of flood control and flood control.

It is hoped that all construction project departments will take action immediately after receiving this notice, do a good job in flood control and flood fighting and do a good job in implementation.

5. Notice of project supervision institutions and business departments on flood control safety of enterprises:

According to the forecast of Shuozhou Meteorological Observatory, from July 22 to July 26, there will be rain in most areas of our city, and there will be heavy rain in some areas. Project supervision institutions and business departments shall, in accordance with the requirements of the Municipal Construction Bureau and the actual situation at the site, arrange and urge all construction units to do a good job in flood control at the construction site. The relevant matters are hereby notified as follows:

First, urge the construction unit to strictly implement the duty system, strengthen emergency preparedness, improve emergency plans, and implement emergency materials and equipment.

Second, the dangerous subdivisional work such as deep foundation pit and high support collision should be checked one by one to ensure that the project does not have any accidents.

Third, whether the lightning protection and grounding facilities are in place.

Four, for lifting operations, aerial work, limb operations, earthwork operations and other operations should have sufficient safety facilities before, if there are any safety and quality hazards, immediately stop, stop operations when necessary.

Verb (abbreviation of verb) Check whether the drainage facilities, machines and personnel at the construction site are properly arranged.

For the above points, the supervisors of the project supervision agency will immediately implement them, and ensure the smooth communication for 24 hours to ensure the safety of life and property.

Notice on Flood Control Safety of Enterprises 6 Municipal (State) Agriculture Bureau (Committee) (Agriculture, Animal Husbandry, Aquatic Animal Husbandry):

Since the flood season, there have been different degrees of floods in many places in our province, especially in the mountainous areas around the basin and earthquake-stricken areas, which are prone to secondary disasters. On the 24th, a sudden mountain collapse occurred in Xinmo Village, Diexi Town, Maoxian County, Aba Prefecture, which sounded the alarm for flood control and disaster reduction in various places. To this end, the party group of the office attaches great importance to it, and all localities should pay close attention to rain, water, disasters and people's feelings, and do a good job in disaster prevention and relief and disaster reporting in a timely manner. The relevant matters are hereby notified as follows:

First, fully implement the responsibility of flood control and disaster reduction.

Municipalities (States) agricultural departments should attach great importance to the redeployment and re-implementation of flood control and disaster reduction work, and implement responsibilities at all levels. It is necessary to check again the implementation of flood control and drought relief responsibilities, the formulation of emergency plans and the preparation of emergency measures to ensure that all disaster prevention measures are in place. It is necessary to further mobilize and strengthen emergency duty. Once a disaster occurs, it is necessary to carry out disaster relief work at the first time.

The second is to strengthen the guidance service in flood season.

It is necessary to guide flood-prone areas to adjust planting structure and implement technical measures for disaster prevention and mitigation; Intensify the investigation of facility agriculture, check and maintain livestock and poultry sheds again, ensure the smooth drainage lines of rain and sewage in farms, and guide large-scale farms to deal with feces in time to avoid pollution spread; Guide all localities to strengthen the reserves of disaster relief seeds, fertilizers, vaccines, forage and other materials.

Third, strengthen the dispatch and submission of disaster information.

Strengthen coordination and cooperation with meteorological departments, forward meteorological early warning information, and do a good job in prevention. Adhere to the combination of daily dispatch and emergency dispatch, actively do a good job in early warning and emergency response, and collect and submit disaster information according to the requirements of Natural Disaster Express and the prescribed time limit and content, so as to predict before the disaster, respond at the first time after the disaster and summarize after the disaster. Strengthen communication with local departments for finger prevention, emergency response and disaster reduction, implement departmental linkage and regional cooperation mechanisms, adhere to unified leadership, and do a good job in joint consultation and information sharing.

Fourth, try our best to restore agricultural production.

Effectively strengthen the prevention and control of animal diseases, do a good job in immune disinfection and harmless treatment of dead livestock and poultry, deal with sudden outbreaks in time, strengthen quarantine supervision in circulation, and prevent dead livestock and poultry from entering the market. Actively coordinate with relevant departments to ensure the smooth transportation of agricultural materials and agricultural products. Actively coordinate the agricultural insurance department, verify the disaster situation as soon as possible, and implement insurance claims. Organize and mobilize the masses to do a good job of self-help in production, reduce disaster losses as much as possible, and help do a good job in recovery and reconstruction.

Please cities (states) in accordance with the requirements of the annex, summarize and report the occurrence of flood disasters since June. The disaster report must include the disaster occurrence process, disaster losses, production self-help measures and difficult problems, and be submitted to the contact person's mailbox before the morning of June 26th (Monday) 12: 00.

;