China Naming Network - Auspicious day query - On July 29th, Henan Expressway Traffic Operation in Zhengzhou

On July 29th, Henan Expressway Traffic Operation in Zhengzhou

The latest traffic information in Zhengzhou is as follows. In fact, some traffic in Zhengzhou has been restored, but the subway is still not in operation, but you can take the bus. Zhengzhou's buses and bicycles are free for the time being. Traffic situation

Today (July 29th) Zhengzhou is not restricted

Today is July 29th, 221 (Thursday), and the number of motor vehicles is not restricted. Before the normal traffic management is resumed, the traffic police department will notify in advance.

The latest news of Zhengzhou Metro

Rumor: On July 28th, Zhengzhou Metro Group announced that "Zhengzhou Metro Line 5 was running empty today, and the carriages of Metro Line 5 soaked in the rainstorm were consigned away", which was verified to be untrue.

progress: Zhengzhou metro is currently in a state of suspension of the whole network. Among them, the drainage, disinfection and desilting of

Line 1 have all been completed, and the communication signal equipment, contact network electricity, lighting system, ventilation system and platform doors of the whole line have all been restored. It has been verified that 51 electric buses can be put into use.

The pumping and drainage of stations on Line 2, Suburb Line, Line 4 and Line 5 have been completed, and the work of interval pumping and drainage, dredging, cleaning, disinfection and disinfection is being carried out, and the maintenance of various equipment such as lighting, ventilation, electricity, communication and vehicles has also been promoted synchronously, rapidly and orderly. The No.51 train on Line 5 is in the process of re-track rescue in the main line section, and the operation service of the whole network train is suspended, and the emergency repair and resumption of production are being carried out in an orderly manner.

reminder: no-load trial operation will be realized after the work of emergency repair and resumption of production is completed, and the time to resume operation will be determined according to the opinions of the third-party evaluation unit, and the specific time will be released in time.

Zhengzhou Bus

As of 8: on July 29th, Zhengzhou Bus has resumed operation of 339 buses, with a line recovery rate of 1%. 292 lines were resumed across the line, accounting for 86.14%, and 47 lines were operated in the interval, accounting for 13.86%.

in order to ensure citizens' travel at night, Zhengzhou bus has resumed the operation of 28 night bus lines. It will also provide services to the 34, 83, 9, B12, 6, 9, 6, 62, 97 express lines, 32, 8, B38, 63, 96, 94, 111, 81, 84, 11, and 11. The operation time of B11, B12, B21 and B22 ***35 lines is extended to 23: , and the departure interval of the above lines is 15 minutes per shift during the delay period.

Zhengzhou public transport will be free for another month

In order to help the city to resume work and production, encourage the general public to take public transport, reduce private car trips and reduce urban traffic congestion, the municipal government has decided that all passengers who take Zhengzhou public transport will be free from July 28th to August 28th, without swiping their cards, scanning their codes and putting in coins.

*** bicycles will be free for another 15 days

In order to facilitate citizens' travel, the urban management department has asked bicycle companies to put an additional 9, * * * bicycles in the first batch, and make adjustments according to citizens' needs, focusing on residential areas, slip roads and back streets and alleys. In addition, in order to facilitate citizens' travel, the Municipal Urban Management Bureau communicated and coordinated with three bicycle companies, namely, Qingju, Ha _ and Meituan, which were put in Zhengzhou. On the basis of the free cycling activities from July 21 to 28, a free cycling activity for another 15 days (from July 29 to August 12) will be launched from July 29, during which all brand vehicles can scan the code normally and ride without deduction.

Rental and online car rental

There are 11,875 cruise taxis and 32,75 online car rentals in Zhengzhou City. Except for vehicles damaged by wading (965 cruise taxis and 2,426 online car rentals), the other vehicles are operating normally. As of 16: on July 28, there were 7,815 cruise taxis online, with an online rate of 71.63%; There are 12,183 online cars, with an online rate of 41.9%.

Reminder: If you find illegal traffic behaviors such as arbitrary charges during your trip, please immediately call the traffic service hotline 12328 to make a complaint and report, and traffic law enforcement officers will do their best to protect your legitimate rights and interests.

Long-distance passenger transport

Zhengzhou Transportation Group has 396 passenger lines. As of July 28th, 395 lines have been resumed. On the 28th, 125 flights were dispatched, and 1,675 passengers were safely transported. Water and electricity in the city's passenger transport center station, South Railway Station and West Railway Station have been restored and can maintain normal operation. The passenger transport north station is still in a state of water and power cuts due to serious damage, and manual ticket sales are temporarily adopted; The East Passenger Station uses its own generator to generate electricity and maintain the normal operation of the main facilities in the station.

Public transport and passenger transport in counties (cities)

There are 123 buses in urban areas, and 119 buses have been put into normal operation, with a re-connection rate of 96.7%. Among them, the urban buses in Xinzheng, Zhongmou, Shangjie, Xingyang, Dengfeng, Gongyi and Port Area have all been restored (66.7% in Xinmi); There are 11 passenger stations in all districts, counties and cities, and 1 of them have been operating normally (Xinmi East Passenger Station is still being repaired due to flood discharge); There are ***247 inter-county commuter lines and inter-county urban and rural passenger lines, and 138 lines have been put into normal operation, with a reopening rate of 55.9%. Among them, the inter-county commuter lines and urban and rural passenger lines in Xinzheng, Zhongmou and the port area have all been restored to traffic (the rest: Shangjie 88.9%, Xinmi 51.2%, Xingyang 29.7%, Dengfeng 86.2%, and Dengfeng 86.2%).

Road conditions of Henan Expressway

As of 1:5 on July 28th, 221, the control of the Gongyi section of Lianhuo Expressway was lifted, and all vehicles resumed normal traffic, among which the Gongyi section of 621km-633km was two lanes from east to west, so please slow down and drive carefully.

As of 9:3 on July 29th, 221,

1. Due to stagnant water, the toll stations that are forbidden to get on and off are:

Hebao Expressway: Xinxiang East Station

Shangdeng Expressway: Gucheng County Government Station, Chaohuasi Station (you can get off in the east-west direction)

Zhengzhou Ring Expressway: Yingtaogou Station and Longhai West Road Station. The sections where dangerous goods transport vehicles are prohibited from getting on the station are:

Hebao Expressway: Huojia Station-Changyuan North Station

Nanlin Expressway: Anyang East Station-Neihuang Station

Anyang Northwest Ring Expressway: the whole line

3. The sections where more than seven passenger cars and trucks are prohibited from getting on the station are:

Zheng Luan Expressway: Houzhai.

5. Due to the road collapse, the two-way control of Jiluo Expressway from km to 19 km is prohibited.

6. Due to the emergency construction of the 46km east half of Jiluoxi Expressway, vehicles from Luoyang to Jiyuan were diverted at Mengjin West Toll Station, and the traffic from Jiyuan to Luoyang was normal.

7. Due to the rain, all vehicles are prohibited from getting on the road:

Deshang Expressway: Fanxian East Station

Daguang Expressway: Puyang South Station-Nanle Railway Station

Taihui Expressway: Taiqian Station-Puyang Station

Nanlin Expressway: Nanle South Station-Nanle East Station

8. Crane is needed due to the accident, and Jiguang Expressway New Area North Station. Please detour in advance, and other highways in the province will pass normally.

Henan high-speed traffic police reminder: In case of emergency on Henan expressway, please call Henan high-speed traffic police alarm number 371-682811 or high-speed service number 12328 for help.

Zhengzhou airport flights

Zhengzhou flights take off and land normally. Weibo, the official of Zhengzhou Airport, reminded that flights at Zhengzhou Airport have returned to normal one after another, and the specific situation can be confirmed with the airline. In addition, since July 27th, some people who have carried out flood fighting and rescue work in various regions of Henan Province began to return home. In order to let these warriors go home early, Zhengzhou Airport opened a green channel for emergency rescue workers.

Zhengzhou Airport Traffic

Due to the recent weather, the rail transit in Zhengzhou City was suspended; Some lines of intercity railway with temporary passenger cars and airport buses have resumed operation, among which: the two-way operation of civil aviation hotel station, Zijingshan station and Zhengzhou railway station to the airport has resumed in the city; Long-distance lines will resume operation in Luoyang, Kaifeng, Xuchang, Xinxiang, Pingdingshan, Jiaozuo, Anyang, Dancheng, Heze, Jiyuan, Luohe, Mengzhou, Nanyang, Puyang, Shangqiu, Yuzhou, Zhoukou and Zhumadian; The current airport high-speed traffic is normal.

Trains and high-speed trains

On the 28th, Zhengzhou East Railway Station reported that Beijing-Guangzhou high-speed railway, Xulan high-speed railway, Zhengzhou-Wan high-speed railway and Zhengzhou-Fuzhou high-speed railway have gradually returned to normal order, and the proportion of resumed trains has reached 8%. However, the disaster is serious, and it still takes time to fully recover. Some trains in Zhengzhou East Railway Station and Zhengzhou Railway Station are still out of service. Passengers can pay attention to the website of Railway 1236 or the "Railway 1236”APP to understand the real-time operation of trains and stop trains.

in addition, all tickets of stopped trains can be refunded free of charge at the refund window of any railway station in China within 3 days (including that day), and passengers who have purchased tickets through the 1236 website or the "Railway 1236”APP can also directly apply for free refund online.

Zhengzhou municipal solid waste treatment

From the 24th, Zhengzhou Urban Management Bureau started the emergency removal work. At present, the domestic garbage disposal in Zhengzhou is gradually returning to normal. However, due to the impact of heavy rain, among the three domestic waste treatment plants in Zhengzhou City, Houzhai Waste Comprehensive Treatment Plant is unable to treat garbage due to power supply, road damage and other reasons, and is currently in emergency rescue. It is expected that the road repair work will be completed in 7 days to resume operation. Due to power system failure, four boilers in Yingjin Waste Incineration Power Plant are operating normally and are gradually resuming operation. Zhengzhou Dongxing Environmental Protection Energy Co., Ltd. has been running at high load. Situation of scenic spots in Henan

As of July 27th, of the 58 A-level scenic spots in Henan, 381 were closed, with a closing rate of 65.68%, and only 5 of the 5A scenic spots were open. Henan Provincial Department of Culture and Tourism issued a document on the 28th: All tourist attractions shall not be opened without authorization!