What units can the quality acceptance of the construction process be divided into? Among them, what are the acceptance criteria of partial projects, which should be determined by
1, conformity of engineering drawings with design requirements.
2. The quality and specifications of materials meet the design requirements.
3. The construction conforms to the design regulations and technical standards.
4. Installation, fixing and adjustment shall conform to technical specifications and engineering design requirements.
5, the construction results meet the acceptance criteria, etc.
These acceptance work should be organized by the construction unit or the general contractor, and its objects mainly include the construction unit and its quality inspectors, the supervision engineer of the construction unit, relevant departments and owners. , so as to ensure the quality and effect of the engineering construction process to achieve the expected goal.
Engineering quality acceptance procedure
1, the inspection lot and subdivisional work shall be jointly accepted by the supervision engineer (project technical director of the construction unit) and the project professional quality (technical) director of the construction unit.
2. The chief supervision engineer (the project leader of the construction unit) shall organize the project leader of the construction unit and the technical and quality leaders to carry out the acceptance of the partial project. Sub-project investigation of foundation, foundation and main structure, and acceptance by the project leader of the design unit and the technical and quality leader of the construction unit.
3, after the completion of the unit project, the construction unit shall organize relevant personnel to carry out inspection and evaluation, and submit the project acceptance report to the construction unit.