Personal summary of reservoir managers

Strengthening reservoir management is a very important task. Therefore, the responsibilities of reservoir managers must be implemented very well! Therefore, the personal summary of reservoir managers must be done well. The following is a personal summary of reservoir managers that I compiled for you. If you like it, you can share it with your friends!

Personal summary of reservoir managers 1

In 20--years, I The county reservoir flood control work is under the correct leadership of the county party committee and the county government, and under the care and guidance of the superior departments, conscientiously implements the spirit of the provincial and municipal reservoir flood control work conferences, strictly follows the "safety first, always be prepared, put prevention first, make every effort We have always adhered to the work goal of "preventing major floods and rescuing major dangers", paid close attention to implementation, worked hard, fully completed various flood prevention tasks, and achieved the safe flood season in the county's reservoirs. In order to sum up experience, exploit strengths and avoid weaknesses, the summary report on the reservoir flood control work in our county this year is as follows

1. The forms and results achieved in this year's reservoir flood control work

1. Since the beginning of the flood season, our county has experienced frequent rainfall, especially five major consecutive rainfalls since September. The rainfall in September reached 251.7 mm, more than three times the 80.9 mm in the same period in previous years. On September 17, the rainfall exceeded Heavy rain reached 50 mm. This precipitation process caused the county's rivers to surge and the water storage capacity of reservoirs to increase sharply, with more than 10 million cubic meters more than the same period in previous years. Lingao Reservoir exceeded the flood limit water level by one meter, so the current reservoir overturned and overflowed. The water storage in Houwa Reservoir reached the warning level, and the spillway slope collapsed. Other reservoirs also experienced varying degrees of danger. The flood control situation is very serious. Flood control pressure increases.

2. Achieved results In the face of the above severe situation, the county party committee and county government attached great importance to it, made reasonable arrangements, and made solid deployments. They immediately mobilized rescue teams and technical personnel to carry out rescue operations on the front line and eliminate various problems in a timely manner. Hidden dangers were detected, and the third-level flood control early warning was activated, all kinds of emergency supplies and rescue machinery were mobilized, and all efforts were made to rescue the emergency. The gates were opened in time for drainage to reduce the pressure on the reservoir. At the same time, personnel in the threatened areas of the reservoir were relocated and resettled to ensure personnel safety. , engineering safety.

In the face of this continuous heavy rainfall, more than 2,000 rescue personnel were deployed in various reservoirs across the county, more than 30 machines were used, and more than 8 million cubic meters of water were drained, leaving 32,000 people in the reservoir area. people, 20,300 acres of farmland, 17 important facilities protected from flood disasters, and a direct economic reduction of 10.5 million yuan.

2. Main measures taken to safely handle floods in reservoirs

1. Flood control safety responsibility system This year we have clarified the administrative responsibilities, responsible persons and reservoirs for the 7 reservoirs in the county The person in charge of the management unit and made a public announcement. Before the flood, various flood control responsibility systems for the reservoir were put in place.

The county government signed a flood control responsibility letter with the reservoir. Minimum requirements have been put forward for flood control materials and rescue teams in each reservoir. The county government has adjusted and enriched the organizational structure of the county flood control and drought relief headquarters, and flood control in the Jiang Reservoir has been the top priority of the county's flood control work. The county flood control headquarters announced the administrative and technical responsible persons for flood control of each reservoir to the entire county through cable TV, and clarified their respective flood control responsibilities. Especially in view of this year's autumn rainy weather, we have further strengthened the administrative head responsibility system, and established a flood prevention and rescue expert group to go deep into the hazardous areas to provide guidance, strengthened the rescue force, and further consolidated administrative responsibilities, technical responsibilities, and rescue responsibilities.

2. Flood control capacity building This year we have strengthened the construction of flood prevention and early warning capabilities and the construction of emergency rescue teams.

First of all, the flood control plan for the seven reservoirs and the flood control and emergency response plan were revised and detailed many times to ensure that no items were missed, and the various measures in the plan and the contact numbers of relevant flood control personnel were discussed. At the same time, we promptly distributed the plan to all reservoirs, relevant towns and downstream people, and signed a relocation understanding card with the downstream people, clarifying the relocation measures and direction, so that everyone is aware of the situation, and there is no chaos in case of danger. Having an idea in mind improves the operability of the plan. A mass information sending system was also installed to ensure the timeliness of information transmission and gain time for flood prevention and rescue operations.

At the same time, we also strengthened the drills and training of the rescue team. Lingao Reservoir established a rescue team of 350 people, divided into three rescue teams; Tieniu River and Guxian two small (1) reservoirs Rescue teams of 100 and 150 people have been set up respectively, and rescue teams of more than 50 people have been set up for each of the four small (two) reservoirs. The county has also organized a flood prevention emergency team to prepare for emergencies. Each rescue team registers personnel one by one, establishes files, clarifies the division of labor, and strengthens training and drills to ensure that they are available, useful, and effective.

3. Preparations before the flood. In order to get through the flood smoothly before the flood, we first carried out a pre-flood inspection and dealt with any problems found in a timely manner. At the same time, the flood discharge equipment such as the water gates and spillways of each reservoir were inspected and implemented. Emergency power supply and emergency power supply equipment were installed to ensure the safety of the flood season. Emergency dam protection plans have also been prepared for Lingao Reservoir, Tieniu River Reservoir, and Guxian Reservoir. First, all flood discharge tunnels will be opened under extraordinary circumstances to increase flood discharge; second, sandbags will be used to raise the top of the dam to prevent overflowing; third, Contact the local armed departments as soon as possible, mobilize militia reserves, and even mobilize troops for rescue. The construction of flood prevention materials and emergency rescue teams has been strengthened.

In accordance with the needs of flood prevention and emergency rescue, the person responsible for flood prevention materials has been further clarified, and minimum requirements for material quality and storage have been put forward. At the same time, we continued to mobilize the county's cadres and masses to actively carry out a campaign to donate woven bags for flood prevention. This year, each reservoir has a total reserve of 120,000 flood-proof woven bags, 500 lifebuoys, 1,000 life jackets, 2 assault boats, 10 meters of flood-proof wooden piles, 5 tons of iron wire, 16,000 square meters of colored strips, 500 meters of stone materials, and 8 generators. Station, 14 searchlights, 200 emergency lights, 10 lighting facilities, 450m of wiring, 3 poles and 10 poles planted, and 32 rescue vehicles. Under very difficult circumstances, the county finance department arranged a flood prevention fund of 300,000 yuan.

4. Flood season operation and management The weather has changed abnormally this year, with more sudden heavy rains. First, we have strengthened the observation of reservoir water conditions, assigned full-time management and maintenance personnel to all 7 reservoirs in the county, and improved the rules and regulations for reservoir management. , it has been implemented that the inspection personnel work in groups of three to take turns to inspect and take timely measures when encountering danger. Identify problems and deal with them decisively. In response to this year's autumn rainy weather, we made advance arrangements, strengthened monitoring, implemented responsibilities, discharged water in advance, and freed up storage capacity to cope with damage to the dam caused by heavy rains and floods. The county's reservoirs supplied and drained more than 8 million cubic meters, ensuring the safety of the dam.

5. Personnel transfer Due to the heavy rainfall since September, the reservoirs in our county are generally in danger, affecting 32,000 people, 20,000 acres of farmland are safe, and the direct economic loss reached 10.5 million yuan. Especially in Houwa Reservoir, due to the sharp increase in water level to the warning level, and the collapse of the spillway slope, which blocked the drainage of the spillway, the safety of about a thousand people in four downstream factories and mining enterprises and two village groups was threatened. Our county took timely measures County leaders ensured the relocation of villages, factories, mining enterprises, and township department leaders ensured the relocation of households and people, ensuring the timely transfer of personnel. During this rainfall, nearly a thousand people were relocated in the entire county reservoir area, and 32 vehicles were mobilized.

6. Dangerous Situation Rescue The Qiulin weather in September caused different dangers to occur in various reservoirs in our county. In the face of these dangers, the county flood control headquarters held a special meeting and established a professional rescue headquarters. It is divided into rescue group, technical group and inspection group. The second is to urgently mobilize rescue teams to rush to the front line for rescue operations. The third is to implement controls on some dangerous sections and strictly prohibit people from entering without permission. Fourth, four agricultural vehicles were urgently collected for rescue operations, and local people were organized to quickly join the rescue effort. Fifth, people in dangerous areas were relocated and resettled. This year, there have been more than 10 dangerous situations in various reservoirs in our county, with 3,500 rescue personnel involved, 45 vehicles used, and a capital investment of 690,000 yuan.

3. Problems in the safe flood control of reservoirs

(1) Flood control funds are seriously insufficient and communication facilities are backward. Our county is a national key poverty-stricken county. It is a beggar-type fiscal system. Flood control funds are seriously insufficient, resulting in insufficient reserves of flood control materials. Flood-damaged projects cannot be repaired in time. There is no upfront fee for the four small (two) type reservoirs due to risk removal and reinforcement projects, making it difficult to establish projects. , the project could not start in time, and the flood control and rescue supporting facilities and office facilities were poor. Although the county had equipped all towns and villages with fax machines, some fax machines were damaged and could not be opened due to years of use (7 towns), which affected the timely transmission of flood information. , cannot meet the needs of modern office.

(2) The material allocation is insufficient. Although we have raised funds from various sources and replenished some flood control materials, they are still far from meeting the needs of flood control and emergency rescue. There is also no flood control material reserve at the county level, which affects the timely deployment of materials. When used, it is difficult to carry out normal work.

(3) Early warning and forecasting facilities are backward and information is poor. Due to a shortage of funds, our county's meteorological department has not established a complete weather forecast platform. The delivery of weather forecasts relies solely on radio, television and other channels, which makes it difficult to ensure the timeliness of the information.

(4) The road conditions of flood control roads in small reservoirs are poor. Although the flood control roads in each reservoir were repaired before the flood, some flood control roads were hardened due to topography and other reasons, and the slopes collapsed seriously. , it is difficult for vehicles to enter in case of danger.

4. Suggestions on the safe flood control of reservoirs in our province

(1) Establish special funds 5. There is a serious shortage of funds for the construction of reservoir flood control projects. Although Lingao Reservoir has been repaired and reinforced, the actual risk has not been cured, the flood control facilities are poor, the staff dormitories are severely damaged by water, and the reservoir cannot meet the flood control requirements.

(2) The design of small reservoirs is imperfect, the construction is irregular, the facilities are incomplete, and the management department is in place. Although the state has increased investment in reservoir risk elimination this year, the flood control emergency project cannot be repaired because the early project funding cannot be guaranteed. It is recommended that certain special funds be invested in small reservoirs to solve practical problems.

(3) Strengthen the construction of early warning and forecasting facilities and realize the full sharing of meteorological resources to improve the ability to predict risks.

(4) Strengthen the construction of flood control roads for small reservoirs in our county.

The flood control roads of most small reservoirs in our county are seriously damaged, and flood control materials and other items during the flood season cannot be transported to flood control locations.

Personal Summary of Reservoir Managers 2

Over the past 20 years, the --- district reservoir management work has adhered to the correct leadership of the district committee, district government and municipal water bureau. With the purpose of "seeking truth and being pragmatic, pioneering and innovative", we firmly establish the concept of "safety is as precious as life, and responsibility is heavier than Mount Tai". We closely focus on the overall idea of ​​"raising the level of management and improving efficiency", unite and cooperate, fulfill our responsibilities, and actively Carry out reservoir management work and complete various tasks well. The summary is as follows:

1. Guiding ideology

In accordance with the work arrangements of the District Water Affairs Bureau and relevant municipal business departments, the personnel of the Reservoir Management Office are guided by theories and important ideas and implement them in depth Scientific outlook on development, conscientiously study the spirit of the Third and Fourth Plenary Sessions of the 17th CPC Central Committee, strengthen situational education and style construction, further consolidate and expand the results of in-depth study and practice of the Scientific Outlook on Development, and focus on "raising the level of management and improving efficiency." "The overall work goal, combined with the actual work, actively mobilized and organized all employees to seriously carry out a variety of educational activities, strive to improve the ideological quality, moral quality and professional quality of employees, and provide a solid ideological foundation to ensure the comprehensive implementation of the long-term development strategy and political guarantees.

Starting from 20--, training sessions combining theory and practice of small (1) and small (2) reservoir management offices will be carried out every year under the organization of the bureau party group. Through the combination of on-site lectures and practice, we have a deeper understanding of the relevant knowledge on the safe operation of reservoirs and dams, which enhances the sense of responsibility of the majority of cadres and workers to do a good job in reservoir operation and management, and provides a guarantee for the completion of various reservoir management tasks.

2. Reservoir safety management work

Water conservancy management work has firmly established the safety management concept of "safety is as precious as life and responsibility is as heavy as Mount Tai", and attaches great importance to the safe operation of projects , ensuring safe operation of the reservoir by strengthening reservoir operation safety management.

1. Reservoir operation and management personnel should firmly establish the safety management concept of "safety is as precious as life and responsibility as heavy as Mount Tai" in their work, conscientiously implement the policy of "safety first, prevention first", and adhere to Regular patrols are on duty, and the responsibilities of reservoir dam inspection and inspection are effectively performed, and abnormal situations that occur during project operation are discovered and grasped in a timely manner, which provides guarantee for the safe operation of the reservoir.

2. Strengthen uploading and issuing and reservoir safety inspection work. Regularly conduct open and covert inspections of the safety management of each reservoir, and sign safety responsibility letters every year.

3. In view of the weak safety awareness of villagers around the reservoir, the Reservoir Management Office has conducted safety inspections along various reservoir areas in accordance with the relevant provisions of the "Water Law of the People's Republic of China" and the "Regulations on Reservoir and Dam Safety Management" Uniform safety warning signs have been set up; personnel on duty will promptly track, advise and publicize any play or splashing in the reservoir area.

3. Reservoir irrigation management work

Reservoir irrigation work follows the spirit of the district’s annual irrigation district irrigation work conference, strictly follows relevant irrigation management regulations, and continuously enhances irrigation services. awareness, strengthened internal management, timely irrigation according to the season, and reasonable water distribution, ensuring water use and water storage in the spring, summer and winter irrigation areas, and better completing the water storage, water use, and water conservation tasks in the irrigation areas in recent years. According to records, the annual water storage capacity in the irrigation area is about 7.68 million cubic meters; the irrigated area is about 3,000 acres; 2 million cubic meters are provided for rural drinking water safety.

4. Carry out diversified business operations

Our district contracts reservoirs to individuals to implement "clear water aquaculture" and carry out entertainment activities such as fishing and farm entertainment. At the same time, our district will develop Songtan Bridge and Guokuangyan Scenic Areas.

5. Future work ideas and priorities

1. Continue to strengthen the safe operation management of reservoirs, firmly establish the safety management concept of "safety is as precious as life, and responsibility is as heavy as Mount Tai", and adhere to the Safe operation inspection system, conscientiously perform the responsibilities of reservoir safety operation management, and ensure the safety of reservoir operation.

2. Strengthen the construction of safe drinking water source reservoirs in rural areas, strictly implement clean water fish farming projects, and implement relevant systems. Cooperate with health, environmental protection and other departments to publicize and control related enterprises and pollution areas in the reservoir area.

3. Further strengthen water management in irrigation areas, strictly implement management in accordance with relevant irrigation water implementation measures, effectively improve service awareness in irrigation water, strengthen internal management, irrigate in a timely manner according to the season, rationally distribute water, and achieve planning Use water, use water rationally, and use water scientifically.

4. Open up ideas, boldly innovate, do a good job in diversified operations, change concepts, be self-reliant, work hard to start a business, give full play to the water resources advantages of the reservoir, and vigorously develop diversified operations.

5. Further strengthen internal management, focus on team building, enhance unity, continuously improve management levels, and establish a good image of the Reservoir Management Office. Adhere to people-oriented, pay close attention to the work in the reservoir area, strive to improve the working and living conditions of the management office, and create a good working environment.

Personal Summary of Reservoir Management Staff 3

Under the correct leadership of the Bureau Party Committee, the Bureau Office exerts management, coordination, supervision, and service functions. In accordance with the requirements of its responsibilities, it works around the overall situation and focuses on administrative affairs. Coordination, supervision, secretarial work, publicity, standardized file management, vehicle dispatching, etc. are the focus of the work, strengthening the awareness of the overall situation, and doing some work to promote the smooth development of the overall work. The relevant situation is now reported as follows:

1. Do a good job in learning and capacity building

Seriously participate in the spiritual study activities of the 18th National Congress and the 10th Party Congress of the Provincial Committee organized by the bureau, Organize the writing and learning experience, consciously carry out the study of the 20--year Party and Government Official Document Management Regulations and the latest official document format, and continuously improve the political literacy and professional level of the entire department. Seriously study the overall work report and improve the level of serving the overall work.

2. Do a good job in sending, receiving, processing, and archiving documents

A total of 172 official letters from superiors were received (160 from the provincial department, 3 from the city, and 9 from the county) copies), 36 copies by fax. It was sent to leaders for circulation 99 times, and the seal was used for bureau administration 108 times.

Written more than 10 official documents and briefing materials, and more than 10 notices.

Printed more than 280 copies of documents and more than 6,000 sheets.

3. Do a solid job in publicity and reporting

More than 140 manuscripts were revised, submitted for review, edited and uploaded, 49 of which were adopted by the Department and 4 by China Water Conservancy News.

4. Do a good job in meeting service work

Arranged and arranged 27 meetings, including more than 10 inspections by department leaders and external units.

5. Strengthen the standardized management of archives

Based on organizing documents and meetings, the awareness of standardized archives management has been enhanced year by year, and the management of warehouses, honors rooms, and reading rooms has been strengthened. More than 160 archives have been reviewed. person-times, and completed the aa-level compliance review work.

6. Do a good job in daily government affairs and affairs

Do a good job in the procurement and distribution of office supplies, the distribution, distribution and receipt of annual party newspapers and periodicals, and industry newspapers and periodicals.

7. Strengthen vehicle management

In accordance with production safety requirements and new traffic regulations, vehicle management will be strengthened to ensure driving safety.

The eighth is to assist in the petition work

Next steps

1. Continue to do a good job in publicity and reporting, focusing on building a database-Anniversary brochure Preparatory work for the production, seeking the support of leaders, collecting and organizing relevant manuscripts and picture materials, issuing specific plans, and striving to complete the preliminary preparations for the publication and establishment of the annual special issue of China Water Conservancy News before August 12.

2. Further strengthen the management of official vehicles and safe driving.

3. Based on the special files of the risk elimination and reinforcement project, assist the engineering and prevention offices, formulate specific plans and catalogs for file transfer by bid section, and do a good job in coordination, communication, and connection.

4. Do a good job in daily paperwork, supervise the administrative resolutions of the bureau party committee and other matters in a timely manner, strictly follow the regulations of superior documents and complete them within a time limit, and implement them immediately.

5. Pay attention to assisting in overall central and phased key tasks such as reservoir flood prevention during flood season.

6. Complete other routine tasks temporarily assigned by the leadership.

Personal Summary of Reservoir Management Staff 4

The Reservoir Management Office will conscientiously implement the policy of “safety first, prevention first” within 20 years, and adhere to the combination of regular meetings and supervision , strengthened the implementation of the safety production responsibility system, and achieved good results in safety production. Although the rainfall was the same as in 20--, the power generation volume was second to the highest level in history, generating 1,170 kilowatts more than the same period last year. The annual power generation was 58.92 million kilowatt hours, with a constant output value of 4.655 million yuan. There were no accidents in safe operation throughout the year, creating 3,592 days of continuous safe operation. We mainly benefited from the following aspects:

1. Strengthening education, Pay close attention to safety training

In order to comprehensively improve employees' safety awareness, do a good job in safety production publicity and education, and enhance employees' safety concepts and self-discipline capabilities, this year we have strengthened safety production publicity and education at multiple levels and angles. Singing the main theme of safe production. First, the Management Office compiled and published the "Compilation of Rules and Regulations of the Reservoir Management Office" and distributed it to employees, and organized comparative study based on the "Safety Production Law". We use blackboard newspapers, bulletin boards and other forms to carry out "Care for Life, Pay Attention to Safety" propaganda. At the production line, we use small blackboards and on-site explanations to answer technical questions for employees, and explain technical key points and precautions according to different operating conditions. . According to the safety accidents that are likely to occur in different seasons, a booklet is printed and distributed to employees. We organized employees to study the "Safety Operating Procedures" carefully and conducted safety compliance examinations, with a pass rate of 100%. Through these activities, we greatly improved employees' safety awareness and safety culture awareness, creating a "everyone pays attention to safety, "Safety in Everything" atmosphere. The second is to pay close attention to technical training. Taking the opportunity of the power plant to use its own technology and strength to install the 5# generator set, we organized the installation personnel to explain the structure, principles, components, etc. in detail on site to the operators in batches and time periods. Due to the physical comparison, It is familiar and easy to understand, and has achieved unexpected results.

The No. 5 unit plays an important role in generating electricity during the flood season. The third is to insist that special operators hold certificates to work, and the certificate holding rate reaches 100%. We also sent hoisting operators to go out for study and training, and they played an important role in the installation of the 5# generator.

In view of the current situation of our employees going out to ride in cars, we educate employees to take as few "three no" vehicles as possible, and conduct "three certificates" inspections on vehicles that have been operating in our office for a long time, which effectively guarantees the safety of cadres and employees Travel safely and prevent safety accidents from happening.

2. Pay attention to system construction and pay close attention to the implementation of the responsibility system

This year, we have further rectified the relationship between safety production and economic development based on the living teaching materials of the 9.18 accident, and put safety The focus of the work is to lay a solid foundation. First, in response to the work transfer of the members of the safety leadership group, the director of the management department is the first person responsible for safety production, the deputy director is the team leader, and the personnel, labor union, security, and biotech , power plant and other department heads as members of the safety leading group. We have strengthened safety inspections, and we have also improved the accountability system for production safety inspections. We strictly implement the responsibilities of safety inspectors in accordance with the principle of "whoever inspects, who signs, who is responsible".

The second is a responsibility system in which the head of each department is the first person responsible for safety in the department, and the deputy is the safety officer. Especially for key units in power plant safety production, the responsibility is also clearly defined to the team, forming a system throughout the department. We have established a responsibility system that is vertical to the end, horizontal to the edge, and responsibilities are directed to each person, and a safety production management network has been established. The third is to strengthen daily supervision to prevent accidents. We identify safety officers for key locations and report any accidents as soon as they are discovered. At the same time, we establish a ledger of potential safety hazards so that the foundation of safety hazards is clear, tasks are clear, and responsibilities are clear. We also adhere to the regular safety meeting system and implement daily team inspections and weekly workshop inspections. According to different seasons, various special safety inspections are carried out to prevent the occurrence of seasonal safety accidents.

3. Increase the intensity of technical reform and pay close attention to the rectification of hidden dangers. Safety accidents are no small matter, and safety is benefit.

We have strengthened the efforts to deal with and improve hidden dangers. We treat the rectification of hidden dangers as the main task of preventing accidents. As long as the hidden dangers of equipment are found, we will immediately take measures to rectify them, so that we can rectify and rectify every problem we find. at. Although there has been heavy investment in infrastructure construction this year and difficulties in capital operation, everything has to make way for safe production. Over the past year, the 3# generator set has been overhauled, special rectifications have been made to the flood control backup power supply and circuit, and multi-channel backup has been adopted for the flood control power supply, which has enhanced operability and power supply reliability. For the persistent and difficult problem of butterfly valves, regular operation is required to prevent rust. Regular debugging of water resistance protection. At the same time, the power supply of the plant is increased, the power supply load of the plant is developed, the possibility of simultaneous load shedding is reduced, and the damage to hydraulic structures and electromechanical equipment caused by load shedding is eliminated. Throughout the year, many difficult and technical safety hazards were eliminated, ensuring the safe operation of reservoirs and power plants.

4. Clarify management responsibilities and rely on management to gain benefits

Focus on management of key units and key periods. The division of labor of the branch committee has highlighted the key points. For power plants, It is clear that two team members are in charge, and they will supervise operational discipline and inspections from time to time. During the high water level operation period, the power generation of each shift is monitored throughout the day, and rewards are implemented based on the power generation. At the same time, penalties are imposed for operations that exceed the target to ensure that the unit is at full power and provides more supply. Adopt different power supply methods for different water heads to ensure high water head operation and improve water energy utilization. During the period of high water head operation, measures were taken to ensure the safe operation of the power plant and reservoir by ensuring the safe operation of the power plant and reservoir, and creating a record high in monthly and annual power generation.

For flood prevention work and risk removal and reinforcement projects, in addition to the leaders in charge, the principals also personally handle them.

The orderly implementation of safety production work enables other work to proceed smoothly. The risk removal and reinforcement project progressed rapidly. The dam grouting project was successfully completed during the year. Various construction projects in the station area are in full swing. The reconstruction project of the flood control building and the garden civil engineering project were completed one after another. The environmental construction of the station area has reached a new level.

In 20--20, although the safety production work of the whole department has achieved some results, there are still many shortcomings compared with brother units, and there is still a gap between the requirements of superiors. In 20---, in order to ensure the smooth progress of the dam hazard removal and reinforcement project, we must further educate employees on production safety, improve the safety management network, strictly implement the "three votes and two systems" system, and increase supervision and inspection efforts. Resolutely prevent all types of accidents from happening.

Personal Summary of Reservoir Managers 5

Since this year, under the leadership of the county party committee and county government, and with the cooperation and support of relevant departments at all levels, we have conscientiously implemented the policies of our superiors ,policy. Our office has always adhered to the guiding ideology of "safety first, prevention first, comprehensive management". The alarm bells kept ringing and we worked tirelessly to achieve certain results. We now summarize the safety work in the first half of 2020 as follows:

1. Establish a safety work leadership team

In accordance with the city and county’s safety work requirements and combined with the specific situation of our office, a team headed by the director of the Management Department was established to take charge of The deputy director of safety is the deputy team leader. The person in charge of each department and each station is a member of the safety work leadership team.

Conscientiously implement production safety laws and regulations, formulate various safety production systems and prevention measures, and adhere to the principle of focusing on safety with one hand and economy with the other. It has laid a solid foundation for the comprehensive completion of water conservancy project construction and various work tasks.

2. Establish a complete system and improve facilities

According to the specific conditions of each production unit and department, in accordance with safety Production laws and regulations. The unit's safety production plan and safety measures have been formulated, and responsible persons and areas of responsibility have been carefully implemented to ensure that no one is left with blind spots in the safety management work. Ensure that there are various safety inspection records and safety meeting records in daily life, inspection records every quarter, half-year and year-end safety inspection summaries, and safety prevention measures.

3. Conscientiously implement safety measures

We always adhere to the principle of "whoever is in charge is responsible". At the beginning of this year, 12 safety target management responsibility letters were signed for each site, and we formulated Established target assessment methods and punishment and reward system. The main person in charge of the station is the first person responsible for safety in the unit. The Security Section of the Management Office is responsible for inspecting and supervising the implementation of various safety systems at each station, and adopts regular or irregular patrol inspection methods to ensure that problems are dealt with in a timely manner. Never delay, and ensure that there are laws to follow, well-documented evidence, and key parts of the work to be taken precautions to ensure the smooth development of all work.

4. Engineering Construction Work

In terms of engineering construction, we strictly implement the "three simultaneous" system and the "one post, dual responsibilities" system for safety facilities in construction projects, and adhere to the principle of "whoever is in charge, who Responsible" and "Whoever approves is responsible", strengthened safety measures and strengthened safety management to ensure that the three major engineering projects this year were successfully completed without any safety accidents.

5. Water traffic safety work

Water traffic safety work is a focus of our office’s daily safety work. There are more than 300 large and small boats in Baoshi and Mingyue Reservoirs. In order to ensure water safety, effective measures have been taken in cooperation with the County Maritime Affairs Department, and severe crackdowns have been carried out on illegally carrying passengers and "three noes" vessels produced for self-use, and unqualified vessels have been forcibly suspended and rectified within a time limit. Due to the seriousness of the two ship management offices Be responsible, stick to your job, manage carefully, actively cooperate with the work of superior departments, insist on issuing shipping orders, and there have been no capsizing or sinking accidents this year, ensuring the safety of water transportation.

6. Flood prevention and flood safety work

Flood prevention safety work is the top priority in the safety work of the management office. According to the unified arrangements and deployments of the city and county flood control and drought relief headquarters, in accordance with " Based on the principle of "leveled management and leveled responsibility", the management office established a flood prevention leading group headed by the director, and the two reservoirs also established flood prevention leading groups respectively. It has been achieved that there are command structures at every level, and specific work is grasped and managed at every level. There must be no relaxation or slack in flood control safety work. Flood control plans are carefully prepared, and various flood control and rescue materials and equipment are mobilized and reserved. During the flood season, We have managed to arrange shifts every day, adhere to the 24-hour duty system, keep abreast of rain conditions, manage scientifically, and schedule rationally. This ensures the smooth progress of our safety production work.

7. Fishery management work

This year, in terms of fishery production management, we have increased publicity, tough enforcement and civilized enforcement. The order of fishery production in the reservoir has improved significantly, and the phenomenon of fish bombing and fish theft in the two reservoirs has significantly reduced. Moreover, safety target responsibility letters have been signed for each production operation boat and fish protection boat, and production workers must wear life jackets during operation to prevent illegal operations such as drunken boarding operations. Coordinate and handle various civil disputes, strengthen management, safeguard national property, and ensure that fishery production is accident-free.

Through the concerted efforts of the whole department, we have focused on the management and solid work, we have ensured the safety of engineering facilities, engineering operations, water transportation, flood prevention and crossing, channel operation and internal security. There were no major or minor safety accidents in all the station departments, the safety production was in order, and the economy was developing steadily. In the second half of the year, we will carry forward our achievements, work hard to overcome difficulties, continue to increase safety inspections, deal with problems in a timely manner, and nip accidents in the bud. Keep in mind that safety work is no small matter, and "responsibility is heavier than Mount Tai" in safety work. Put it at the top of all the work of the whole department, and strive to avoid any major or minor accidents throughout the year, ensuring safety work throughout the year and the smooth progress of economic development work.

Articles related to personal summary of reservoir managers:

★ Personal experience and experience of reservoir management in 2017 (2)

★ Personal experience and experience of reservoir management in 2017

★ Personal work summary of water conservancy unit

★ Personal experience of water conservancy workers

★ Five personal summary essays on water conservancy work in 2020

★ 2020 water conservancy employee personal work summary sample

★ 5 selected water conservancy project personal work summaries

★ Water conservancy project management personal annual work summary report

★ Personal summary of water conservancy work in 2017

★ Personal annual work summary of water conservancy