Emergency management bureau fully responds to typhoon plan

Emergency management bureau's comprehensive response plan to typhoon (5 general rules)

In ordinary daily life, it is inevitable that some accidents will happen suddenly. In order to prevent things from getting worse, it is necessary to prepare a specific, detailed and targeted emergency plan in advance. So what is an excellent emergency plan? The following is the emergency management bureau's full response to typhoon plan (5 copies in total) that I collected for you, for reference only, and you are welcome to read it.

Emergency Management Bureau fully responds to typhoon plan 1 In order to do a good job in flood control and typhoon prevention, and ensure the safety of all teachers and students in our school, flood control and school property are not damaged, according to the relevant spirit of superiors and the actual situation of our school, the flood control and typhoon prevention plan is formulated:

The first is to set up a flood control and typhoon prevention team.

Team leader: xx

Team member: xx

Responsibilities of the leading group: xx

Be responsible for flood control and typhoon prevention in our school, do a good job in school building safety inspection, actively contact and coordinate with surrounding units, and arrange emergency rescue work in our school. Carry out publicity and education on flood control, typhoon prevention and flood fighting for teachers and students in various forms, adhere to the principle of "safety first, stand by at any time, and do a good job in flood control and typhoon prevention, so as to ensure that school property is not lost and teachers and students are not harmed.

Two, the establishment of flood control, typhoon rescue team.

Third, the alarm procedure.

School duty room → school principal → school leading group for flood control and typhoon prevention → report.

Four, flood control and typhoon prevention work arrangements and measures

1. Set up a leading group and a rescue team for flood prevention and typhoon prevention in our school to be responsible for flood prevention and typhoon prevention in our school and ensure the safety of teachers and students and the loss of school property.

2. Do a good job in propaganda of flood prevention and typhoon prevention, improve the awareness of all teachers and students on typhoon prevention and flood prevention, and ensure that there are no casualties among teachers and students and no school buildings collapse.

3. Insist on taking turns to be on duty during flood control and typhoon prevention. The leading group should be on duty, and the personnel on duty should stick to their posts and not leave their posts, take off their posts or take over. In case of rainstorm, the main leaders, team members and related teachers must arrive at their posts.

4. The General Affairs Department should carry out strict and meticulous inspection on all houses, leaving no dead ends, and contact the school in time when problems are found. Each class should do a good job of investigation, and the class teacher should keep abreast of the living conditions of students' families, especially those living in remote areas, keep in touch with parents and raise awareness of disaster prevention.

5. The flood prevention and typhoon rescue team members should keep their mobile phones on, ensure the smooth communication tools, and contact them in time. Whenever there is a rainstorm, they should pay attention to the rise of water level in and around the campus.

6. Do a good job in hedge nursing, especially for students who are far away. During the flood season, students in distress can leave school in advance according to the situation. Students in distress can't leave school alone without parents' transportation and teacher's care, and report to relevant departments in time to ensure no casualties.

7. Seize the danger in time. Once the school suffers from floods, typhoons and other disasters or receives the notice of flood control and typhoon prevention from the superior, this plan will be launched in time. All rescue team members should immediately rush to the school, obey the headmaster's instructions, spare no effort to protect the lives of teachers and students, and grab school textbooks.

Verb (abbreviation of verb) matters needing attention

1. The primary task of flood control and typhoon prevention is to protect the lives of teachers and students, and disaster relief should be carried out on the premise of ensuring that people are not hurt.

2, generally do not organize students to participate in disaster relief.

Emergency management bureau fully responds to typhoon plan 2 I. General rules:

1, compilation purpose

In order to do a good job of typhoon prevention, deal with all kinds of disasters caused by typhoon in time, minimize all kinds of losses on my construction site, maintain normal construction and ensure the smooth progress of the project.

2. Scope of application

This plan is applicable to the prevention and emergency treatment of typhoon disasters within the construction scope of this bid section.

3. Working principle

Typhoon disasters are managed according to the construction area, with various functional departments and construction teams as the main disposal, and each functional department is responsible for the construction team. All functional departments actively support, guide and supervise the emergency response work of corresponding construction teams. It is necessary to put the prevention of typhoon disasters in a prominent link and do a good job in various preventive work. Carefully analyze the strong winds and rainfall that typhoon may bring. In case of danger, respond quickly, start this emergency plan in time, and organize personnel to do their best to rescue and provide disaster relief.

4. Focus of work

(1) Waterproofing, pit wall collapse prevention and rolling stone prevention shall be carried out at the construction site of each foundation pit excavation;

(2) Prevent landslides, collapses and other disasters that may cause accidents on the construction roads;

(3) the temporary construction site and the construction team site before the disaster personnel and equipment transfer;

(4) Prepare flood control and drainage facilities for material warehouses on the construction site;

(5) Safety protection measures for vertical transportation equipment, scaffolding and construction electricity;

(6) The living guarantee of each construction site and station during the gale and heavy rain;

(7) Forecast, forecast and early warning of typhoons and rainstorms, and timely release typhoon early warning information to the construction team and the construction site.

Second, the leading group for flood control and typhoon prevention:

The project department set up a leading group for flood control and typhoon prevention with unified command, and each department was responsible for each construction team.

Leading group for flood control and typhoon prevention

Leader of the leading group:

Deputy team leader:

Members:

Three. Prevention and early warning mechanism:

1, typhoon and other disasters monitoring

The safety team of the project department is responsible for the monitoring and information collection of typhoons, rainstorms, storms and mountain disasters, knowing the weather situation in advance, collecting all kinds of information on the base surface and traffic roads of each construction site in time and reporting it to the leading group.

2, the construction site safety inspection

Adhere to the safety inspection of each construction site, take the implementation of wind and flood prevention measures as the focus of inspection work, timely understand relevant information, and arrange personnel to deal with the base surface and roads that may cause harm in advance to avoid accidents when disasters occur.

3, the responsibility of the construction site early warning member to carry out.

Designate a part-time safety officer at each construction site to serve as a disaster early warning officer at the same time, mainly responsible for collecting and reporting all kinds of dynamic information at the construction site and notifying the leading group of instructions. When a disaster occurs, assist each construction team leader to implement disaster prevention measures and command.

4. Disaster early warning mechanism

The security team should establish a monitoring system for weather conditions and construction site conditions, implement information collection measures, adhere to the daily inspection system, and conduct encrypted observation and inspection in rainy season. Once dangerous signs are found, immediately call the police, transfer personnel and related equipment, and report to the leading group of the project department.

Fourth, emergency response:

The leading group of the project department is in full command, with full participation, and coordinates the participation of personnel from relevant departments.

The disaster monitoring department analyzes the development trend of typhoon according to the weather forecast, issues rainfall and wind forecast, puts forward defense targets and reports them to the leading group in time. According to the circular, the leading group made clear the defense objectives and key points, issued personnel transfer orders, declared an emergency flood control and wind prevention period, started this disaster prevention plan, sent special personnel to the affected areas to guide the work, organized and directed the rescue and relief work, reported the relevant situation to the relevant departments at higher levels in a timely manner, and reported it to the higher authorities to coordinate the deployment of medical and living materials assistance when necessary.

Verb (abbreviation for verb) for emergency rescue and disaster relief:

After the typhoon landed or was seriously affected, the disaster prevention leading group held a meeting on emergency rescue and disaster relief in time to deploy emergency rescue and disaster relief work. Organize all staff to rush to the disaster relief site, guide the rescue and devote themselves to the rescue and relief work.

(1) The team leader grasps and summarizes the disaster situation in time, coordinates the related work of emergency rescue and disaster relief, is responsible for the deployment of disaster prevention materials, completes the disaster prevention evaluation work together with relevant personnel, and reports to the construction headquarters and supervision department.

(2) According to their respective responsibilities, each team member shall organize the supply of materials and equipment needed for post-disaster recovery, and give priority to the supply of living materials for construction workers.

(3) Each construction team shall formulate the repair plan of the damaged construction site in time and organize the forces to repair it as soon as possible.

(4) The leading group should contact the local health department, organize forces to actively rescue the wounded and sick, and at the same time cooperate with government agencies to do a good job in quarantine and epidemic prevention in disaster areas to prevent the spread of the epidemic.

(5) Each construction team should organize forces to repair damaged roads and communication facilities, and do a good job in post-disaster production and self-help.

(6) Logistics personnel manage and distribute materials to ensure the supply of daily necessities.

(7) Contact the insurance department to make claims.

(8) After the typhoon, all construction teams and departments shall report the disaster to the leading group in time. After the disaster, the leading group should summarize the experience and lessons of flood fighting, disaster relief and disaster relief, and submit a written report to the engineering headquarters and supervision department.

(9) When the typhoon and disaster situation are effectively controlled, the leading group can announce the end of the emergency according to the information summary.

Six, emergency support:

1, supported by rescue team

All contractors within the scope of our project department are obliged to participate in typhoon prevention and disaster relief. Each construction team takes the team leader and safety officer as the backbone, and organizes all personnel to participate in disaster relief work when disasters occur.

2. Material safety

The Material Logistics Department should reserve necessary emergency materials for typhoon prevention for emergency use in case of major disasters.

3. Financial guarantee

Office to do a good job in the implementation of emergency rescue and disaster relief funds, when disasters occur, according to the instructions of the leading group, do a good job in the allocation and distribution of funds.

4. Communication and information security

Communication methods are mainly mobile phones and hand-held walkie-talkies. When the public telephone network breaks down, the application system of disaster prevention walkie-talkie will be started in time, and the fixed channel of notification will be used to ensure the smooth information channel.

5, medical and health security

The leading group should contact the local health department, be responsible for health and epidemic prevention and medical rescue in epidemic areas, prevent the epidemic of diseases, and do a good job in immunization and disinfection in public places.

6, typhoon relief work evaluation

After each typhoon, the leading group should summarize, analyze, qualitatively and quantitatively evaluate all aspects and links of typhoon prevention and relief work. Summarize experience, find problems, and further do a good job in preventing Taiwan from disasters.

This plan by my project department "leading group for flood control and typhoon prevention" is responsible for the interpretation.

This plan will be implemented from now on.

Emergency Management Bureau fully responds to typhoon plan 3 I. Guiding ideology of typhoon prevention and disaster relief work:

Under the unified leadership of Lucheng Education Bureau, the typhoon prevention and disaster relief work of our school aims at reducing the loss of national property and the safety of teachers and students, minimizing losses, effectively ensuring the safety of life and property of the school and teachers and students, and maintaining the normal teaching and living order of the school. Based on the principle of giving priority to typhoon prevention, supplemented by assistance, according to national laws, regulations and related policies, combined with the actual situation of our school, we have formulated an emergency plan for typhoon prevention.

Second, set up an emergency working group:

School typhoon prevention leading group:

Team leader:

Deputy team leader:

Team members:

Members: all teachers

Three, the main points of flood control:

1, teaching building, multi-function hall, canteen, gymnasium and other buildings.

2. Ensure smooth drainage inside and outside the school.

3. Strengthen the traffic guidance for students going to and from school in typhoon, rainstorm and thunderstorm weather.

4. Improve the ability of teachers and students to protect themselves against sudden weather changes (storms, thunderstorms, lightning, etc.). ).

Fourth, the preparations before the typhoon:

1. mental preparation: through various propaganda tools and forms, vigorously publicize the knowledge of flood control and disaster relief, educate teachers and students, and fully understand the significance of flood control and disaster relief. Resolutely overcome the paralysis of fluky psychology, establish the idea of "believing in what it has, but not believing in what it has" and the view of "standing if you give it, and wasting it if you don't give it", and always be ready, always be ready.

2. Organization preparation: establish the responsibility system for typhoon prevention inspection, define the responsibilities and tasks, do a good job in safety inspection before typhoon, and put forward handling opinions on the problems and hidden dangers found in the inspection. Attach great importance to typhoon prevention and disaster relief, strengthen typhoon prevention duty and safety inspection, implement various typhoon prevention measures, ensure smooth communication, and establish a supervision mechanism.

3. Work preparation: strengthen the inspection of various flood control, flood control and wind prevention work, timely rectify problems within a time limit when found, attach great importance to school safety during typhoon, carefully investigate various safety hazards, and ensure the safety of teachers and students' lives and property.

4. Material preparation: according to the requirements of emergency rescue in possible danger, prepare emergency materials and equipment in advance for emergency use. Strengthen the inspection and supervision of key parts of typhoon prevention, and have sufficient emergency repair force during typhoon to effectively prevent flood emergencies.

Verb (abbreviation of verb) Emergency response to typhoon prevention and disaster relief:

1. After receiving the notice from the higher authorities to prepare for emergency typhoon prevention, or according to the impending disaster caused by typhoon, the school immediately starts the typhoon prevention and relief system, arranges disaster prevention work, enters the emergency state in an all-round way, and does all kinds of emergency work well.

2. According to the actual situation of typhoon prevention and disaster relief in our school, organize the implementation of emergency plans, and carry out typhoon prevention and disaster relief work and rescue operations in our school according to the setting of typhoon prevention and disaster relief institutions.

3. During the whole typhoon, the principals of each campus will arrange for the team members to take turns to be on duty at school, and the duty personnel and duty leaders should be in place in time. The personnel on duty should patrol the campus frequently, and report to the principals and relevant leaders of each campus immediately when finding dangerous situations.

4. Strengthen patrol on duty. In case of heavy rain and long rain, we must pay close attention to the surrounding areas of the school. Once the danger is found, it is necessary to start the relevant emergency plan in time and evacuate teachers and students.

5. Strengthen the traffic guidance for students when they go to and from school during the typhoon; Ensure smooth drainage inside and outside the school.

6. In case of danger, the building should be closed immediately and the operation should be stopped, and the teachers and students should be transferred to a safe residence in time to ensure the safety of teachers and students.

7. Post safety warnings in conspicuous places to improve the safety awareness of teachers and students.

8. Prepare classrooms for the victims in the surrounding areas.

9. In case of personal injury, property loss or serious accident, the school will report to Lucheng District Education Bureau and related departments at higher levels as soon as possible.

10, ask for help110; Fire alarm119; Medical assistance120; Traffic accident 122.

Emergency Management Bureau fully responds to typhoon plan 4 In order to reduce the losses caused by natural disasters, prevent the occurrence of major sudden dangers, and ensure the safety of life and property of enterprises and employees, a typhoon prevention and flood control working group is specially established:

(1) Organizational structure and responsibilities

1. Chief Commander: The general manager of the company is mainly responsible for the personnel arrangement of typhoon prevention and flood control organizations and the overall arrangement of typhoon prevention and flood control work;

2. Team leader of typhoon prevention and flood control: the person in charge of the comprehensive office is fully responsible for typhoon prevention and flood control during typhoon prevention and flood control, timely adjust personnel and materials as needed, and inform the commander-in-chief and the competent government departments within 24 hours;

3. Members of typhoon prevention and flood control team: obey the arrangement of the leader of typhoon prevention and flood control team and do a good job of typhoon prevention and flood control under the leadership of the operation chief;

4. Logistics support: responsible for logistics support during typhoon prevention and flood control, and organizing personnel to evacuate safely in case of emergency; During typhoon prevention and flood control, as a temporary command center, it is responsible for external communication with government departments and supervisors to ensure timely and accurate information transmission;

5. Power group: responsible for normal power supply and power generation at any time during typhoons and flood control;

6. Equipment group: responsible for the normal operation of all typhoon and flood prevention equipment, and also responsible for the maintenance of factories and other places in urgent need;

(2) Hazard identification and risk.

Whenever the typhoon flood season comes, according to the forecast of the meteorological department, determine the emergency response level of the enterprise in time:

1, yellow warning (mild): typhoons below magnitude 6 can operate normally;

2. Red warning (moderate): For typhoons with magnitude above 6 and magnitude below 8, the leaders of all departments are on duty, and the warehouse organizes some personnel to participate in emergency disaster prevention;

3. Black early warning (height): In case of typhoon of magnitude 8 or above, the company will stop operation and fix various equipment and facilities. Irrelevant personnel should be evacuated from the site, and leaders at all levels should take the lead in participating. It is necessary to organize all personnel to cooperate closely under the leadership of the commander-in-chief and go all out to prevent typhoon and flood control;

4. Key prevention parts of the enterprise: staff quarters, various areas of the company, various types of equipment, high-voltage distribution room, office, financial room, etc.

(3) Conditions for starting the emergency plan

1, all employees of the enterprise have the right and obligation to report to the enterprise leaders as soon as they know that the disaster weather is coming;

2. Team leader of typhoon prevention and flood control: according to the actual situation, announce the level of emergency plan, confirm personnel, do a good job in typhoon prevention and flood control, and report the progress to the commander-in-chief at any time;

3. Under the unified arrangement of the team leader, typhoon prevention and flood control work should closely cooperate, support each other, communicate information in time, and report directly to the general manager in case of special circumstances;

(4) Emergency equipment and facilities

1. Emergency Command Center: During typhoon and flood prevention, it is guaranteed that someone will be on duty 24 hours a day, and communication is convenient, with 4 walkie-talkies;

2. The power distribution room, materials and electric power departments are on duty 24 hours a day to ensure power supply. Materials are equipped with shovels, pumps, raincoats, flashlights, sandbags, etc. , easy to use. In addition, there are many cars and trucks, which can be called at any time when needed;

3. For special emergencies, you can ask for help from the local 1 10 or 120;

(5) Emergency skills and resources

1. The emergency command center is close to the company's production office area, with fast and convenient information transmission and high management efficiency;

2. Once the rainstorm comes, the post managers are instructed to send typhoon prevention and flood prevention materials to key parts quickly and timely, and make preparations for disaster prevention in advance;

3. During typhoon prevention and flood control, all communication equipment will be turned on 24 hours, and the telephone lines of the command center and warehouse will be connected directly, and all instructions will be understood at any time and stand by at any time;

(6) Protective measures

1. During typhoon prevention and flood control, security personnel will be mainly responsible for the security work of important parts of enterprises such as the finance department and organize personnel to evacuate safely in time;

2. The logistics department is mainly responsible for the evacuation of temporary places to ensure the normal supply of food;

(VII) Information release and employee education

1, according to the actual situation of each stage, the typhoon prevention and flood control team leader will release relevant information in various forms through normal channels with the consent of the chief commander;

2. We should increase awareness of prevention in publicity and education at ordinary times. When we enter the pre-plan state, all the work will be carried out under the unified command of the typhoon prevention and flood control team leader;

3. According to the weather forecast data, employees are required to avoid passing through the tuyere on their way to and from work.

(eight) targeted training and drills.

1. Every year from July to September, all employees of the company are mobilized and the front-line employees of the company are trained. Training subjects include: sandbag, generator test, material dispatching, emergency repair, equipment protection, personnel rescue, security and so on;

2. In order to consolidate the training results and enhance employees' awareness of typhoon prevention and flood control, organize employees to conduct drills before the flood season every year to improve the comprehensive ability and team spirit of typhoon prevention and flood control in enterprises;

(nine) the method of continuous improvement of emergency plan

The team leader of typhoon prevention and flood control records the drill site of each employee, corrects the underestimation in time, adheres to the good aspects and promotes it;

Emergency management bureau fully responds to typhoon preplan 5 This preplan is formulated in order to implement the spirit of Notice on Doing a Good Job in Flood Control and Typhoon Prevention issued by East China Regional Administration of Civil Aviation and the relevant requirements of local governments at all levels, in combination with Emergency Plan for Flood Control and Typhoon Prevention at X Airport and Emergency Plan for Typhoon Front Attack at Airport.

This plan is used in conjunction with the emergency plan for flood control and typhoon prevention at X airport.

I. Working principles

In accordance with the principles of "prevention" before the arrival of a typhoon, "avoidance" when the typhoon arrives, and "rescue" after the arrival of a typhoon, the emergency response work for preventing the frontal attack of a typhoon will be carried out in an orderly manner.

Second, organization.

The emergency treatment of X airport to prevent typhoon frontal attack is carried out under the unified leadership of X airport flood control and typhoon rescue headquarters.

Third, the responsibilities of various departments.

After receiving the warning notice of typhoon attack, under the unified leadership of emergency headquarters in flood control and typhoon prevention at X Airport, all departments should act quickly and make preparations and implementation of "prevention", "avoidance" and "rescue" according to their respective responsibilities. The responsibilities of each department are as follows:

1. Airport Office: After receiving the warning notice of typhoon attack, inform the company leaders and airport departments in time. After obtaining the consent of the company leaders, start the plan, arrange personnel to be on duty, and assume the responsibilities of the X airport flood prevention and typhoon rescue headquarters office.

2. On-site command center: After receiving the typhoon attack warning and the notice of the start-up plan, timely cooperate with the airport construction management office, maintenance office and security inspection station to bind, reinforce or dismantle the parked aircraft and apron facilities and equipment, and report the relevant information to the emergency headquarters office of the X Airport Flood Control and Prevention Station in time.

3. Air traffic control center: after receiving the warning notice of typhoon attack, do a good job of liaison between the scheduled flights and the transfer of existing flights; Wind prevention, drainage and reinforcement of navigation station; Do a good job in emergency communication support; According to the requirements of the bureau, the contents of the "Airport Air Traffic Control Plan" to prevent typhoon frontal attack were implemented.

4. Maintenance Department: After receiving the warning notice of typhoon attack, according to the requirements of the emergency plan for wind damage of the maintenance department, the parked aircraft will be parked and the special vehicles will be put into storage. For special vehicles that cannot be stored in the warehouse, they should be parked far away from the parked aircraft, and brakes should be set and wheel blocks should be added. The equipment and facilities on the apron should also be put into storage with windproof measures and anti-collision cones, and the traction rods and working ladders should be put into storage or fastened to prevent other facilities from being damaged by wind. This planning scheme is an emergency plan for preventing typhoon frontal attack at the airport. Strengthen the personnel on duty and keep the communication open.

5. Airport Construction Management Office: After receiving the warning notice of typhoon attack, strengthen the protection of power supply system, make preparations for emergency repair of power supply, and ensure normal power supply. Windproof measures should be taken for the equipment and facilities on the tarmac. After the gale, check the airport roads and lighting facilities immediately to prepare for the opening of the airport.

6. Security checkpoint: After receiving the warning notice of typhoon attack, reinforce and bind the covered bridge to prevent accidents.

7. Freight Center: After receiving the warning notice of typhoon attack, take windproof measures for freight equipment and facilities outside the freight warehouse, and transfer the freight equipment and facilities on the tarmac to the freight warehouse.

8. Airport Public Security Bureau: After receiving the warning notice of typhoon attack, all fire-fighting vehicles and air defense guard vehicles should be put into storage or parked in the downwind, and equipped with brakes and wheel blocks. All police officers are on standby, ready to accept the dispatch of emergency headquarters for flood control and typhoon prevention at X airport and participate in emergency rescue work.

9. Other departments: stand by at any time according to the duty requirements of the emergency plan for flood control and typhoon prevention at X airport, and keep the communication smooth.

Fourth, the job requirements

1, responsibilities in place, clear division of labor. According to the Emergency Plan for Flood Control and Typhoon Prevention at X Airport and the Emergency Plan for Typhoon Frontal Attack at X Airport, all airport departments can formulate implementation rules, define the responsible person and the specific responsible person, and decompose the typhoon prevention tasks determined in the plan to the specific responsible person, forming a horizontal and vertical work network and a flexible and efficient contact and response mechanism.

2, fully prepared, effective measures. All departments should organize experienced and capable personnel to deal with emergencies according to the typhoon prevention plan. When a strong typhoon attacks or affects the airport head-on, emergency rescue personnel should stand by and gather at the specified time to prepare for the war, as well as emergency materials, equipment, transportation tools, etc. Should be arranged in the front line in case of emergency call. Report to the Municipal Emergency Office in a timely manner and contact socialized emergency materials, equipment and tools. And make emergency preparations.

3, strengthen vigilance, timely disposal. The office of the flood control and typhoon rescue headquarters arranges personnel to master and develop flood dynamics, report in time when they encounter over-alert, abnormality or danger, and organize evacuation, emergency repair and reinforcement in time. In case of emergency, while reporting to the superior, we should take the initiative to take emergency measures, seize the favorable opportunity, implement emergency treatment and eliminate hidden dangers.

4, emergency duty, smooth communication. After receiving the warning notice of typhoon attack, the office of flood control and typhoon prevention and rescue headquarters and all departments implement the 24-hour duty system to keep the information flowing. The heads of all departments and the personnel in charge of typhoon prevention in their own departments turn on their mobile phones day and night to track the rain, water, customs, disasters and secondary disasters, hold timely consultations and start relevant emergency procedures according to different situations.

Verb (abbreviation of verb) supplementary clause

1. The Airport Company is responsible for the interpretation and implementation of this scheme. And revised in time according to the actual situation.

2. This scheme shall be implemented as of the date of promulgation.

;