When will the construction of Nine-hole Gate in Longmen Port in Taizhou start?
2. Work place: Longmen, Wenling, that is, the water area connected by the following five points. (WGS–84 coordinates).
(1) 28 25 ′ 1 ″ n, 121 39 ′ 59 ″ e (2) 28 25 ′ 24 ″ n, 121 4 ′ 17 ″ e
(3) 28 25 ′ 7 ″ n, 121.
IV. Precautions:
1. The project is located in the customary navigation channel of Jiudongmen, Longmen. During the construction period, the navigation channel will be closed, and no navigation signs will be set at both ends of the navigation channel;
2. The operation ship should display the construction operation signal strictly according to the regulations, keep VHF channel 16 on duty and strengthen the alert;
3. Passing ships should strengthen their lookout, drive carefully, pay attention to the dynamics of working ships, avoid working waters, drive around, and obey the instructions of on-site warning boats;
4. In case of severe weather such as strong wind and fog, stop the operation.