Project work summary model essay 2020
Work summary of project model essay in 2020 (1) With the correct leadership of manager xx and the joint efforts of colleagues in the department, by the end of xx, we have completed xx commercial and residential building and Yujingcheng 1#, 2#, 6#, 9#, 13#, 15# and so on. Based on the principle of reviewing the past, summing up experience, finding out shortcomings, and then enriching and improving ourselves, we reviewed and summarized the work of the engineering department from the following aspects.
I. Project management
Project management is the core and focus of our work. With the continuation of project management in xx years, the engineering department has invested more energy in project construction management. With the joint efforts of our colleague Qi Xin, our department has overcome various difficulties. After a year's efforts, we have completed the fire control acceptance and completion acceptance of xx, the acceptance of civil air defense in the new world, the completion filing of xx, the preliminary procedures of the first phase of Yujingcheng project, and the quality and technical management. At present, Yujingcheng 1# building, 6# building, 13# building, 15# building and 16# building are progressing steadily beyond the requirements of the owner, among which 13# building. Our department strictly abides by the "three controls" management method of the project. Starting with the control of three important factors: time limit for a project, quality and cost, strengthen contract management and information management, coordinate the relationship with design, supervision, general contracting and subcontracting, and strengthen management measures.
1, set goals, establish rules and organizational systems, and pay special attention to the construction management of the construction unit.
In 20xx, our staff will go all out to achieve the safety, quality and progress goals of the first phase of Yujingcheng Project. At the same time, popularize 5 1# plot.
At present, on the whole, the progress and quality of the eleventh construction project of Yujingcheng in Shaanxi are satisfactory, but there are also some problems. We deeply reflect and sum up the following reasons: (1) The construction period planning or adjustment of individual control nodes are not well considered, and they are not sensitive and forward-looking enough for possible problems in the planned operation. (2) The influence of objective factors such as bad weather environment. (3) The design becomes more and more, and the designer can't reply in time. (4) Some construction units are lax in discipline, site management is not in place, and plans are not implemented.
2. Attach importance to the role of contract in project management, classify and file all kinds of engineering technical data, actively coordinate the working relationship between all parties and deal with on-site problems.
The construction project contract plays a very important role in the concrete implementation of the project, which comprehensively stipulates the rights, obligations and responsibilities of all parties involved in the survey, design, construction and supervision of the project. In the concrete implementation process of engineering construction, our department strictly abides by the contract, and implements the quality responsibility, demarcation, drawing design, process use approval and approval system stipulated in the contract well. By studying the problems related to the contract execution raised by all parties, the solutions to the problems related to the project progress are put forward in time and implemented by the supervision engineer. When necessary, adjust the construction means, construction resources, construction organization and contract period.
3, pays special attention to the safety and civilized site management.
Safety and civilization is a work that can't be ignored in construction projects. According to the safety and civilized project management objectives of this project, our department urges the construction unit to implement the safety regulations and production rules and regulations promulgated by the State Council and various departments during the construction process. In the process of implementation, we have mainly done the following work:
(1) In order to enhance the image of the construction site and the safe and civilized construction, the construction site, the construction management area and the living management area are scientifically arranged and rationally configured, and coordinated with various environments. The construction unit is required to carry out the construction according to the safety and civilized standard of chemical industry.
(2) Supervise the supervision engineer to do a good job in safety control to ensure that there is no danger, no accident, no personal injury and no property loss during the construction.
(3) Supervise the supervision engineer and the construction unit to ensure that the construction site and temporary land are orderly, civilized and safe, the environment is protected, the traffic is smooth, the fire control facilities are complete, and the site capacity and environmental sanitation meet the requirements.
(4) Coordinate the relationship among contractors, supervisors, relevant departments in the design department, surrounding projects and communities, and create a good internal and external environment for the project construction.
Second, follow up the design in time and prepare for the project.
According to the living habits of Fuyang residents, communicate with the designer in time to discuss and improve the room type, which involves the living habits of residents. Promptly urge the reply of the contact list for the questions and some unknown drawings in the construction, and try to avoid the delay of the construction period.
Third, do a good job in engineering quality and technical management.
Strictly carry out process acceptance according to drawings, contracts and specifications, "quality first", and realize that engineering quality monitoring is the "life" of our work. In order to achieve the expected goal of project quality, it is necessary to control the project quality in advance, monitor it in the process and control it afterwards. The specific method is: strictly control the entry of raw materials, components and equipment, and every inspection must be attended by our personnel and sent for inspection throughout the process. All materials used in the main structure and decoration materials must go through inspection procedures, and must issue factory certificates, product certificates and retest reports. Only qualified products and materials can enter the site for use. In order to make the distribution room in Gui Huayuan residential area not occupy the planned position and minimize the impact on customers, the distribution room was set in the basement of civil air defense to solve the problem of storey height. The leaders of the engineering department communicated and coordinated with relevant departments and personnel for many times, which was finally properly solved.
Strengthen process quality control to ensure the excellent structure of the main project. For the construction of important parts and key nodes, supervisors are required to stand by and watch the whole process. For beam-column steel binding, concrete pouring, manual digging pile construction and waterproof layer detail construction, the supervision engineer should insist on strict on-site supervision according to the regulations, find and correct the quality problems existing in the construction in time, urge the construction party to rectify the existing problems, so as to nip the quality problems in the bud during the construction process, and actively carry out normal supervision and inspection. Site representatives must go deep into the site to understand the site situation, coordinate and solve the existing problems, correct the unqualified ones in time, and persist in rectification. If unqualified or inferior materials are found, insist that the construction unit repel and enter the site to ensure the engineering quality. Pay attention to the quality of work. Front-line employees must be upright and honest, convince people by reasoning, treat people equally and be polite, create a good cooperative atmosphere for enterprises, ensure high quality and fast work, be promoters instead of tractors, and all employees in all departments are diligent in their legs, hands, mouths and brains. Through hard work, together with the supervision and relevant parties of the construction project department, we will jointly create a good situation of win-win for all parties.
Strict project acceptance, to ensure the timely realization of the project quality objectives. Take cover engineering, process handover acceptance must be signed by representatives of all parties before the next working procedure can be constructed, so as to prevent the occurrence of rework events caused by the acceptance of missing items and ensure the orderly construction of the project.
Four. Shortcomings in work and areas needing improvement
In the process of summing up experience and meeting challenges, we found several problems worthy of our improvement and face up to, which still need to be overcome and corrected seriously in order to improve and make the management level to a new level, mainly in the following aspects:
1, further improve and refine the project management system, clarify the management procedures, and make the project management more smooth and efficient. The internal division of labor and responsibilities have been clarified, and the work order of uploading and releasing, unity and cooperation, standardization and order has been established, which has effectively promoted the smooth development of all work.
2. With the rapid development of building technology and the frequent updating of specifications and procedures, it is necessary to strengthen the professional quality training of engineers, study in their spare time, and strengthen the study of drawings, industry regulations, commonly used specifications, procedures and atlas.
3. It is also necessary to strengthen the coordination and communication between departments, "plan and arrange early", and do a good job in various preparations before and after construction.
4. The professional quality of management and technical personnel of some construction units is poor, which can not meet the actual needs of construction management, such as unfamiliarity with construction drawings, poor safety awareness and imperfect self-inspection system; Management input is not in place.
Summary is a mirror. By summing up, we can objectively judge the achievements and lessons, advantages and disadvantages, difficulties and opportunities of the past year, clarify our thinking, make clear our goals, and formulate measures to provide reference and guarantee for the next work. So as to have a clear understanding and profound analysis of difficulties, find solutions to difficulties, have a strong insight into opportunities, and make preparations for seizing opportunities as soon as possible.
Verb (abbreviation of verb) is the focus of 20xx to ensure the progress and quality of project development.
Strategy determines fate, and ideas determine the way out. In the new year, the engineering department should make clear the main ideas of work. In order to ensure the project development progress and achieve the expected goals of the company leaders, the Engineering Department will focus on the following work in 20xx:
1, Yulong Bay Commercial and Residential District completed for the record;
2. Safety, quality and schedule control of the first phase of Yujingcheng Project:
3, 5 1# plot development coordination;
4. Organization and management of new projects and milestone plan management.
In 20xx, the company began to build at least two commercial and residential projects. It is suggested to adopt the project management mode of "joint organization", which is suitable for the integrated management of multiple projects in our company. Combined organizational structure: established under the direct leadership of the general manager of the company, including project A, project B and various functional departments. Each project has a project department and a project manager who is responsible for the professional technical scheme, quality control and overall speed improvement of the whole project. Setting milestone targets, milestone plan management realizes the management of project quality and progress process control through the work breakdown framework of the project, and realizes the organic combination of project process management and target management, which is conducive to promoting the coordination of relevant departments in relevant links and realizing the integration of residential project construction.
Combined with the company's development strategy, we will conduct targeted personnel training, build a team with fine management, technical knowledge, good management and high quality, strive to make the best use of people, and use creative incentives to assess personnel, thus creating various training and learning opportunities for employees.
With the arrival of 20xx, our company is taking solid steps, people-oriented, paying attention to and earnestly implementing the needs of customers at all stages, and further improving the company's comprehensive management platform. The scale of the company's development has been continuously expanded, the product structure has been continuously optimized, and the economic benefits and comprehensive strength have been continuously enhanced. Facing the development of the company, the engineering department will actively implement the work system with fine project management as the core, taking "meticulousness" as the attitude, "meticulousness" as the process and "Excellence" as the result into the project management. Looking forward to the future, engineers are meeting the development and challenges of the company with full spirit, high fighting spirit and full confidence!
Overview of project work: I have been engaged in project management since I joined the company, mainly responsible for the preparation of construction technical scheme, construction site management and construction data collection. 20xx65438+was assessed as a technician in xx Hydropower Engineering Co., Ltd. in February, and the professional and technical work done since 20xx was assessed as a technician is summarized as follows:
I. Work attitude
Second, the specific work
I am mainly responsible for construction management, construction site resource allocation (personnel, machinery and materials), construction scheme preparation, data statistics, engineering quantity measurement declaration, construction project cost and schedule analysis, etc.
In the usual work, we should first do our daily work well. I have a division of labor with other members of the project department. When I encounter problems, I will consult the leaders, consult relevant information in time and solve them effectively. I will insist on regular work exchanges with other technicians, fully develop democracy, put an end to arbitrariness and unify thoughts and steps, so as to successfully complete all production tasks of the project.
In the process of on-site construction management, strict control is carried out from five aspects: construction personnel, construction machinery, construction methods, construction materials and construction environment. People are the main body of construction, and the responsibility and ability of construction personnel directly determine the final quality of engineering results. Therefore, before the project starts, the qualifications of all construction personnel and types of work should be strictly examined. Secondly, check the technical parameters of all kinds of mechanical equipment on the construction site, eliminate potential safety hazards in time and minimize the accident rate. The choice of construction method is particularly important, which is related to the realization of project objectives. Every time we set up a project department, all our technicians will consult relevant materials and make comparative analysis in various ways. In the process of construction implementation, we will comprehensively consider the advantages and disadvantages brought by the determination of construction methods to the realization of project safety, cost and progress, and finally determine the most reasonable construction method through the comparative analysis of demands. Building materials affect the whole process of the project.
In order to achieve the quality goal, in the process of engineering construction, our technicians fully consider the physical properties of materials and arrange the working procedures reasonably to ensure the smooth progress of the project. Finally, the uncertainty of the construction environment directly affects the progress of the project. Before the start of construction, all our technicians refer to the weather during the project according to historical records and arrange the construction period of the main part reasonably. During the construction process, check the weekly weather forecast on the Internet in time and arrange the weekly work plan reasonably.
Three. abstract
The above is the main work I have done in project management, and other work is not dominant in my work content, so I won't elaborate here. Generally speaking, as a construction site manager, I have accumulated some useful work experience and been familiar with excellent professional and technical capabilities for many years, but I will further strengthen my study, work hard and constantly improve my professional skills in the future.
Project Work Summary Fan Wen 2020 (III) I graduated from the School of Environment and Chemical Engineering of xx University in xx Province in October, 20xx, and studied in this school for four years, and obtained a bachelor's degree in chemical engineering and technology. Since I joined the group, I have been responsible for the energy technical transformation of the whole group company, technical support and process audit of new projects. The professional and technical work in recent years is summarized as follows:
First, the political demands for progress.
Over the past few years, I have actively participated in various trainings organized by the company, made full use of my spare time to learn the Party's line, principles and policies through magazines, newspapers, computer networks and TV news, supported the Party's leadership, supported the socialist system, supported the reform and opening up policy, loved chemical technology and engineering work, and was full of affection for the units I served.
Second, pay attention to learning at work.
If you can learn and master new technologies, new knowledge, new standards and new norms in time and apply them to your work, you should persist in strengthening the study of chemical technology according to the needs of your work and apply the skills you have learned to your practical work, so that your business level will be greatly improved and you will have strong business working ability. In recent years, I have been engaged in technical and management work in multiple positions, and can obey the arrangement of leaders according to the needs of work. When I was a technician in Wuxi Xifo Industry and Trade, I had many shortcomings in silicate deep processing because I studied chemical engineering and technology. I study and work in my daily work, strive to improve my professional and technical level, and learn the advanced glass deep processing technology in China. During my work in this company, I had my own experience in silicate deep processing.
I have a certain foundation, and because of my strong chemical drawing ability, I constantly improve my professional skills in my work and study more advanced processing technology in my practical work. During this period, I completed the design and drawing of the window glass of xx high-speed train, successfully completed the project, and created brand benefits and economic benefits for the company. In addition, at the end of 20xx, the company cooperated with the glass company xx Glass to undertake the tempering project of solar glass of xx Company. In this project, I am mainly responsible for the quality control of tempering. Through the unremitting efforts of the whole company, the tempering of xx solar glass was finally completed, which made its own contribution to enhancing the brand value of the company. 20xx was transferred back to his hometown to work in March, and joined xx Group after returning to his hometown. Now he is working. After joining xx Group, he got closer to his major, made better use of the professional skills he had learned in the university, constantly studied and improved himself in the work of xx Group, and made his own efforts in several engineering projects such as dry quenching in xx and waste heat recovery in xx flue gas. In the low-concentration gas power generation project of xx coal industry, technical and engineering investigations were carried out on several projects such as xx iron and steel energy-saving technical transformation project, and efforts were made for the implementation of these projects. In addition, the site project of xx steel slag barrier process was also inspected, and the most advanced steel slag treatment process in China was the most intuitive and appropriate. It laid a technical foundation for the new steel slag treatment process of xx iron and steel in the future. In addition, this year, we also carried out the investigation and environmental impact assessment of the 600,000-ton steel slag micropowder project in the second phase of xx slag micropowder Co., Ltd., put forward our own opinions on the feasibility analysis of the project and the preparation of the environmental impact assessment report, and participated in the preparation and evaluation of the project. It laid a theoretical foundation for the implementation of the next project. In the process of constantly improving and upgrading myself, I love this job more and more. Will make its own contribution to the progress of the company.
Third, do a good job of passing, helping and bringing.
Since joining xx Energy Group Co., Ltd. in 20xx. Because I am a newly established energy management department, there are few professional and technical personnel and lack of professional skills guidance. In addition, most employees are recent and their technical level is relatively insufficient, so the manager asked me to help and teach you professional skills. I patiently taught them the knowledge of chemical technology, not only the theory, but also in some places. At the same time, I teach them some principles of being a man, so that they can like this job quickly. After more than a year, they not only went it alone, but also became the backbone of the department. In the process of project assistance, we do our best, do our duty, and combine theory with practice, so that everyone can get in touch quickly and easily in the learning process, and at the same time learn from each other's strengths and constantly enrich themselves.
Fourth, study patiently at the professional level.
Because the times are developing and society is progressing, some high and new technologies are constantly being put into the energy industry. Especially in recent years, the problem of energy utilization has attracted more and more attention from the society. Many energy-saving technologies and waste heat recovery technologies have been put into practical production process. In order to better serve the company, we have to constantly improve ourselves, study patiently, study hard, learn new knowledge and new technology, and put forward new projects that are more energy-saving and more environmentally friendly in combination with the actual situation of the company. To this end, I often contact various energy-saving service companies to learn about the latest energy-saving technologies in China, and put forward some ideas to the leaders according to the actual situation of the group. I hope I can better serve the company and be responsible for my work.
Verb (abbreviation of verb) professional continuing education
Due to work needs, I attended the advanced seminar on investment, financing and capital operation of xx University in Taiyuan in June, 20xx. We should not only know the knowledge of our major, but also look at the whole domestic economic situation to understand the economic situation and avoid the narrowness of theoretical study. The study of this seminar made me fully realize that technical work should adapt to the market economy in order to highlight the role of technology as the primary productive force.
The above is a brief description of my technical work in recent years. Through learning from books, learning from practice, learning from others, plus my own analysis and thinking, I have indeed made great gains and progress. However, achievements and shortcomings coexist, and experience and lessons keep pace. Overcome shortcomings and learn endlessly. In the future, I will, as always, go all out in my work, keep learning, strive for progress, constantly improve my professional quality, exercise my working ability, sum up experience and learn lessons, do my work better, serve the training and care of the unit, and contribute all my energy to the unit and the port cause.
After more than a year of hard work, I have made some achievements and management experience in enterprise management and project management, among which the main achievements are:
First, optimize the organizational construction plan and improve the scientific management level.
Since 20xx, I have always put scientific management and optimization scheme in the first place in construction management, and constantly studied and discussed the construction scheme which is suitable for project management and has strong operability, so as to meet the needs of the project and Party A. In the formulation of each construction scheme, I have repeatedly demonstrated it according to the characteristics and difficulties of the project, and increased the scientific and technological content of the organization scheme with a scientific attitude. Continuously expand the scientific management channels in the scheme.
1, such as: xx residential building project, with a construction area of 24,022 ㎡ and a total height of 57.25m, with one underground floor and eighteen floors above ground, and reinforced concrete shear wall structure. The quality goal is to create a municipal project and a demonstration project without common quality problems.
In order to ensure the construction period, in view of the narrow space and more residents in the surrounding residential buildings, the original design of waterproof curtain for foundation pit supporting cast-in-place piles, 12m, a * * * 2.5 million, cost 930,000 yuan. The dense cement mixing pile with circular plane layout was changed, which not only realized the supporting pile, but also played a role in stopping water. Shorten the construction period by 36 days and save investment by nearly 460,000 yuan. It won the satisfaction of Party A. In the connection of thick steel bars, I adopted the cold extrusion connection technology of cabr rebar sleeve, which improved the work efficiency by three times compared with the pressure arc welding connection method. In terms of formwork support technology, the original scheme uses shear wall formwork to support wall bolts, and the support rod is plastic pipe, which is too wasteful. After research, we heated the plastic pipe of the through-wall bolt into a plastic pipe that can be pulled out by both big and small heads, which reduced the damage rate of planing design by 30% and saved the cost by 6.5438+0.5 million yuan.
2. The original formwork was supported by a small steel formwork, but in the developed fair-faced concrete construction technology project, the large formwork steel-wood assembly system should be adopted to reduce the gaps between the formwork, and the construction joints have no obvious traces, thus canceling the plastering layer. After being decorated with paint, it can meet the requirements of advanced plastering data standards and use functions, save plastering materials and labor, reduce the self-weight of the building itself, reduce the input of formwork costs, and avoid a large number of repair costs caused by common quality defects. In terms of shelf erection, the original scheme used double-row floor-standing external shelves, which was too many large tools, time-consuming and high rental cost. In order to reduce the cost, I used the tool hanger according to the characteristics of the building, which is safe and light, and also saves a lot of money.
Second, strict quality management, striving for famous brand projects.
"Quality first" is the eternal theme of enterprises and the goal they pursue. In my years of construction, I can put quality first from beginning to end, insist on winning the reputation of enterprises with quality, meet the needs of owners, expand the construction market of enterprises, and create more fine products for beautifying the city. Since 20xx, I have been insisting on the following measures:
1. Implement quality assurance measures to improve monitoring in place. I insist on strict quality assurance function and clear division of labor in the project. Adhere to the quality document disclosure and quality handover records. Ensure that every quality construction has a document disclosure. In order to better guide production personnel to operate according to standards and requirements. Full-time quality controller on the project, I actively give him some corresponding power, let him take the initiative to lead the quality, create high quality, let them further prepare the quality monitoring plan, and assist the division of quality management of this project on the whole basis to ensure that there is no blank point in quality monitoring.
2, key parts, key monitoring. For the construction site prone to quality accidents, I insist on special personnel control, do a good job of monitoring and management, and solve problems in time when found.
3. Strictly standardize and improve the operation level. In terms of quality management, we should mobilize everyone to strictly check and accept according to the specifications, control each working procedure well, and implement the standard of market excellence to the operation surface, so that all contractors can know what kind of products are the standard of market excellence, so as to achieve product excellence once and save secondary maintenance.
4, layers of management, everyone checks. I have always insisted on forming a quality management atmosphere for everyone on the project. Quality management is not only the job of quality controller, but also the quality index of other project managers. We should also be responsible for quality excellence. It is necessary to form an operator who is responsible for his own construction face in layer-by-layer management, and the subcontracting team is responsible for the contracting area. Project managers should be responsible for their respective project merit indicators, and the project managers should be responsible for the whole project merit standards, so that the project quality management is under strict control.
Through my own exploration in quality management, I have mastered some tips of quality management. I have enriched my power to control the project quality management. At the same time, I have also created some famous projects in these years' construction. For example, in order to ensure the realization of the excellence project in the staff residential building of the Institute of Technology, I started from the source, strictly controlled the entrance of materials, cooperated with the equipment management personnel to strengthen the acceptance of materials from the aspects of appearance inspection and re-examination, and resolutely left the site if it failed, so as to ensure the smooth excellence of the project and the implementation of the excellence measures, which made the project win the market advantage and won the trust and satisfaction of the construction unit. They handed over the follow-up project plan to us. It has made a certain contribution to the reputation of the enterprise and the occupation of the market.
Third, arrange the working procedures reasonably and speed up the construction.
As a project commander, I attach importance to the project construction scheme and quality assurance measures, and never relax the implementation of production schedule. Especially in the construction management for many years, no matter what difficulties are encountered, the construction period has never been delayed because of the production plan management. On the time limit for a project management, I always insist on:
1, strengthen site control and carry out the plan. In daily production management, the construction site plan is clear, and I know exactly what cycle and where to go. Therefore, in the construction management, I insist on using the construction plan to guide and carefully arrange the field work, strictly control the pace of construction management, ensure the construction progress, and implement it as planned.
2, strengthen the construction organization, the implementation of resources in place. In order to ensure the smooth production of the project, I always allocate materials, labor, materials and other factors of production on the spot, and calculate the factors of production in advance according to the progress of the project, so as to make the work more predictable, thus strengthening the rational allocation of materials and manpower and ensuring uninterrupted construction.
3. Strengthen the insertion degree of the project and implement the construction efficiency. Suitable for many types of work in engineering. Reasonable organization and insertion of completed projects is the key. Many years of construction experience tells me that my aim is: unified coordination, unified command, reasonable arrangement, and meeting the needs of each other, whether it is interchange operation or horizontal mixed operation, or reverse construction or forward construction.
4, strengthen the responsibility to the people, the implementation of segmented package. According to the construction layout, my customary practice is to decompose the project progress indicators and put the responsibility on each foreman. According to the work arrangement of ten-day monthly insurance, monthly insurance and quarterly insurance, do a good job in layer-by-layer package plan and implement it in pieces. Through years of hard work, I have persisted in and constantly enriched the above four measures, and created a construction reputation in project schedule management.
Four, strict cost management, improve project efficiency.
In 20xx years, in view of the project cost, in the usual construction, I have always insisted that benefit is the foundation of the project. Without benefits, the project means lack of value. Over the years, I have done two things in grasping project cost management:
First, grasp the project cost analysis system and improve the internal management interface. Take the lead in organizing the monthly project cost analysis meeting of project cost, quota, budget and equipment. Cost engineers are also required to report the expenses incurred in the current month to ensure that the planned part, budget revenue, equipment consumption and cost accounting reach several times, and the actual cost of the project is correctly accounted. At the same time, in the cost analysis, every official is required to control the project cost in advance next month, predict the parts and phenomena that are easy to cause waste in advance, and formulate corresponding solutions. Eliminate the problem of cost management in the bud.
The second is to raise the awareness of project accounting and put an end to unreasonable expenditure. Saving and tapping potential projects are all large households. Over the years, our project has continuously strengthened and reformed accounting consciousness, constantly revised saving measures, and paid attention to saving in the internal cost management of the project. If you make gadgets, try to process them internally. The packaging of materials should be in place at one time to reduce the number of times. Civilized construction, not chasing the situation, chasing high standards. Especially in the use of materials, everyone is very concerned about * * *. Form a management situation in which everyone keeps accounts carefully and everyone can keep accounts.
Through adhering to and perfecting these two cost management measures for many years, we have not lost money in the project construction task and have done some work for the enterprise to create benefits. In the new year, I will continue to struggle and do my best for the development of the enterprise.