Entering the 2 1 century, especially in the last decade, the woodworking machinery industry in China has made rapid development. Do you know how to write a woodworking contract? What do you usually need to pay attention to? If you don't know, the following is a sample woodworking contract I prepared for you, for your reference only!

Woodworking construction contract 1

Party A:

Party B:

According to the needs of construction, Party A subcontracts the project to Party B for construction in the way of contracting and not contracting materials. In order to facilitate the cross management of construction work between teams and groups, clarify the rights, responsibilities and obligations of both parties in the performance process, ensure the construction quality of subdivisional work, strengthen the control of construction progress, and ensure the smooth progress of the project, both parties enter into the following contract through consultation and abide by it jointly.

I. Project name:

Second, the project site selection:

Three. Scope of contract:

Within the scope of the construction drawing, all the construction contents, all the drawing changes and technical changes during the construction process (including before construction) of the frame main formwork project have been included in the contract scope.

Iv. contents of the project:

Template production, installation, template removal, cleaning, classified stacking, plate cleaning, plate gap sealing treatment, nailing and other template construction processes. After the completion of the project, reusable materials should be cleaned, classified and piled up.

Five, the project contracting way:

1. This project is contracted in the form of contracting without materials (i.e. labor, quality, progress, safety, civilized construction and material saving). Party B is responsible for portable electric tools and hand tools.

2, according to the construction drawings, including the template engineering changes and other parts of the labor costs according to the actual area of valuation.

Six, quality requirements:

Strictly require the construction according to the drawing, which meets the specification requirements and the quality grade must meet the requirements.

1. The formwork and its support must have sufficient rigidity, strength and stability, and the supporting part of its support must have sufficient supporting area. The slurry leakage shall be cleaned up by the woodworking team. When pouring concrete, carpenters must assign special personnel to guard the formwork and wash the leaked concrete slurry with water, otherwise they will be fined RMB every time.

Seven, the construction period:

Party B's construction must meet the needs of assembly line operation, complete Party A's progress on time, and shall not delay the construction progress of other teams due to its own reasons.

Eight. Payment terms:

Nine, project management responsibilities:

A. Party A's responsibilities

1, provide effective construction drawings and deal with construction technical problems; ?

2. Provide external scaffolding and safety net;

3. Be responsible for coordinating and dealing with the contradictions arising from the crossover operation of each operation team and other situations on the construction site, and try to avoid rework and repair due to inadequate cooperation. Party B must obey the handling opinions of Party A;

4. Provide template materials to the site in time;

5, responsible for the template engineering quality tracking inspection and quality supervision, responsible for the template component project quality evaluation and acceptance;

6. According to the requirements of specifications, standards, contracts and construction drawings, Party A is the final confirmer of the quality of sectional works and divisional works;

7. Organize relevant personnel to measure the smoothness, verticality, slag inclusion and slurry leakage of concrete surface in time after formwork removal, conduct quality evaluation according to the current acceptance specifications and evaluation standards, and take the actual evaluation results as the basis for rewarding and punishing the installation quality of Party B's formwork;

8. Provide construction water, electricity, night construction lighting and temporary accommodation for field workers;

9. Pay the project payment according to the schedule agreed in the contract.

B. Party B's responsibilities

1, before construction, you must be familiar with the drawings and make safety technical disclosure to the workers. All workers must be skilled workers, and the operation of special types of work must hold relevant certificates. Abide by laws and regulations, Party A's rules and regulations and management regulations, obey the command of Party A's construction management personnel, and do not embarrass Party A's personnel for any reason;

2, familiar with the drawings, according to the requirements of the drawings in advance with good template, try to reduce redundant materials;

3, found in the process of construction drawings design problems, timely report to Party A's foreman, shall not change the design without authorization;

4. Party B shall pay attention to the maintenance of large construction tools and machinery provided by Party A during use, compensate for improper operation and man-made damage, and be responsible for safety accidents;

5. Prepare the material plan in advance according to the drawings and process requirements, and submit it to the foreman of Party A for approval;

6. Party B must strictly abide by the operating rules of safety technology and relevant safety laws and regulations, and the responsibility for safety accidents caused thereby shall be borne by Party B;

6, civilized construction, completes the construction organization and management, carefully clean up the site after work, nail the template, material classification, neatly stacked. Pay special attention to check the stigma, beam groove, etc. And be sure to clean it up; ?

7. Arrange the carpenter's duty work during concrete pouring in advance, and check it regularly during concrete pouring. If deformation or looseness is found, it should be repaired and reinforced in time;

8. If the rework caused by unqualified quality or other negligence is Party B's responsibility, Party B shall bear the losses of machinery and materials caused thereby.

9. Coordinate the working procedures of relevant teams in the flow process, without making things difficult;

10, no trouble at the construction site, no slander, no fighting, once all illegal acts are discovered.

100 yuan fine, if the circumstances are serious, it will be handed over to the public security organ for handling.

1 1, use templates reasonably, and do not cut large templates at will without the consent of the competent foreman. Offenders will be fined more than RMB yuan each time depending on the seriousness of the case.

12. Any agreement or contract signed between Party B and a third party in this project shall be the responsibility of Party B, which has nothing to do with Party A, and Party A will not approve it.

13. During the construction process, Party B shall be responsible for all safety accidents (including third parties) caused by Party B's own reasons or violations.

14. Party A strictly forbids Party B to dismantle, modify or move the power distribution facilities without authorization, as well as to lose the power distribution facilities and violate the safe use of electricity, and all consequences shall be borne by Party B..

15. Party A forbids Party B to dismantle, modify or move the safety protection facilities without authorization, or damage the safety protection facilities or violate the safety operation, and all consequences shall be borne by Party B..

16. If Party A fails to use the safety helmet and safety belt when entering the construction site, it shall be ordered to make corrections and be fined by 50 yuan.

17. The person in charge of Party B must stick to the construction site, arrange work, direct management, and lead its employees to carry out construction according to Party A's requirements and relevant construction safety regulations, and ensure the quality and quantity according to the progress requirements. All losses and adverse social impacts caused by poor management and dereliction of duty shall be borne by the person in charge of Party B. If Party B fails to make rectification for three times, Party A has the right to terminate the agreement and the remaining project funds will not be settled.

X. engineering changes:

If the construction project is added due to the change of drawings or the construction content is greatly changed, and the cost is greatly increased, which cannot be described in the original contract terms, a supplementary agreement can be signed through negotiation.

XI。 Warranty liability:

During the warranty period, if Party A notifies Party B not to make rectification within a time limit, Party A will send another person to guarantee the warranty, and the expenses will be deducted from the warranty fund.

This agreement is made in duplicate, one for each party, and shall come into effect as of the date of signing.

Party A: Party B (construction responsible party):

Signing place:

Date of signature: year month day.

Woodworking construction contract 2

Party A:

Party B:

In accordance with the Contract Law of People's Republic of China (PRC), the Construction Law of People's Republic of China (PRC) and other relevant laws and regulations, both parties, following the principles of equality, voluntariness and fairness, entrust the formwork project contracting and material construction of Wuhu Huahengyuan 1-3# building to Party B for organization and construction, and conclude this contract through negotiation.

First, the way of contracting:

1, contractors, contractors, contractors, contractors, contractors, contractors, contractors, contractors, contractors, contractors, contractors, contractors, contractors, contractors, contractors, contractors, contractors, contractors, contractors, contractors.

Second, the scope of contracting:

1, carpentry formwork (including formwork and labor) production, wall-penetrating screw production and installation (including secondary structure formwork) of this project. Specific contracting scope: carpentry labor and materials such as formwork support, materials required for formwork removal, formwork sample turning, fabrication, installation, dismantling, erection and dismantling of steel pipe internal support, pre-embedded punching of steel dowel, punching of Rachel reinforcement, installation of embedded parts, formwork removal, nailing, neat stacking, and painting with isolation agent. All concrete surface templates and frame structures in the drawings shall be leveled by specially-assigned personnel free of charge. The large line and elevation shall be completed by Party A's construction personnel. ..

2, tower crane or gantry crane and other mechanical equipment foundation template production and installation, template production site changes and secondary transfer or temporary transfer for other reasons, during the construction of civilized standardization site involved in the work all belong to the woodworking team. Party B shall provide wood.

Machinery, small tools, materials, mobile electrical boxes under secondary electrical boxes (including power cords). Cooperate with the construction unit subcontracted by Party A and other professional subcontracting teams (free cooperation).

3, all woodworking materials and machinery into the loading and unloading and transshipment (free of charge), safety protection facilities, civilized construction site appearance, etc. All carpentry and handyman services related to the project (including vertical transportation machinery and horizontal transportation that cannot be constructed, as well as repair and reconstruction of living quarters, etc.). ), so that it will be clear after work.

Third, the project quality and construction requirements:

1. The quality standard of this project is one-time acceptance. Party B must carry out the construction according to the construction drawings, atlas, technical verification sheet, change notice, construction organization design, construction scheme and technical disclosure. Accept the inspection and acceptance of the government, construction management department, quality inspection department, construction unit, supervision unit and Party A at any time to provide convenient conditions for inspection. If the agreed standards cannot be reached due to Party B's reasons, the expenses shall be borne by Party B, and the construction period shall not be postponed. Party B shall strengthen quality control, control the flatness of formwork surface, and ensure that the ceiling meets the standard of fair-faced formwork, otherwise, Party B shall pay the related expenses for the quantities required by bricklayers to paint the ceiling.

2. Party B must carry out the construction in accordance with the requirements of drawings and construction specifications, and can continue the next working procedure only after Party A's acceptance and supervision's acceptance.

3. If the construction process and the part required by Party A are changed, Party A shall notify Party B in writing, and Party B shall implement and ensure the quality of the changed project is qualified.

4. All economic losses such as labor, time and materials caused by Party B's failure to construct according to the drawings, construction specifications and change requirements or the unqualified acceptance of Party A, supervision and quality inspection departments shall be borne by Party B. ..

5. During the construction of this sub-project, Party B must cooperate with other sub-project construction teams.

6. Party B guarantees that the quality is among the best in the inspection organized by Party A or the construction unit. In case of quality problems during construction, Party A will not only bear all the expenses, but also punish Party B as appropriate.

Fourth, the time limit for a project requirements:

1, Party A plans to carry out the construction of the main structure every 1 1 day, in which the carpenter guarantees to complete the erection of the structural plane formwork within 6 days, so as to ensure that the rebar worker can tie the rebar on time. Party B shall reasonably arrange the labor force according to this goal, and ensure that the 1# and 2# main buildings and 3# five-story structures will be capped at the end of the year. The rainy season has been delayed for two days in a row.

2. This project is carried out in accordance with the time limit stipulated by the construction unit and the construction progress plan formulated by Party A. If the sub-project cannot be completed as planned, Party B must bear the delay of other types of work and all losses suffered by Party A as a result. ..

3. Due to Party B's reasons, Party A will impose a fine on Party B according to the daily 500 yuan for each day of delay in the construction period. Party A will reward 500 yuan for one day ahead of schedule.

Verb (abbreviation for verb) staffing:

1. Party B appoints a comrade as the person in charge of the site to handle all the affairs on the site.

2. The person in charge of Party B's site must accept the attendance of Party A, arrange the construction at any time, and supervise, inspect and accept the safety, quality, progress, civilization, hygiene and material control. If you have to ask for leave when going out, you can leave only after being approved by the main person in charge of Party A's site.

3, Party B's site manager, must cooperate with Party A at any time, * * * with the construction drawings,

4. All personnel of Party B must obey the unified leadership of Party A, abide by Party A's rules and regulations, and go through the employment procedures according to national regulations. According to the engineering quantity, Party B's construction personnel shall be no less than 15.

Six, safety, civilization and health:

1. Party A shall examine Party B according to the Safety Agreement for Building Installation and Construction, Detailed Rules for the Administration of Safety in Production, Provisions on Handling Safety in Production, Provisions on Punishment for Civilized Construction and corresponding supplementary clauses formulated by Party A, and Party B shall conduct safety inspection on construction personnel and conduct pre-shift (pre-post) safety education.

2. Party B must carry out the construction in strict accordance with the contents of the safety production agreement and safety operation regulations, and carry out it in time according to the safety and civilized punishment regulations. If any major or minor safety accidents occur to Party B during the project construction, all responsibilities and expenses shall be borne by Party B, which shall handle them by itself, and Party A shall not bear any responsibilities and expenses.

3. The construction meeting will be held once a week. The participants are the project department managers and team leaders, and the 20 yuan fine system is implemented. If the site construction personnel find that they don't wear safety helmet, they will be fined 150 yuan/person.

Seven. cost control

1. During the construction period, Party B shall use reasonable materials and clean up the site after work. If it is found that the materials do not meet the quality requirements, fines will be imposed as appropriate, and materials will be collected in time after formwork removal.

Eight, the project payment method:

1. Party B is the contractor and the construction area is RMB/m2 (including labor cost RMB/m2 and template material RMB/m2).

2. After pouring concrete on each floor, Party B shall be paid 60% of the completed project on this floor (excluding daily living expenses and loans), 90% of the total contract amount after the project is completed, and 65,438+000% of the total contract amount after the project is completed and accepted.

3. If there are carpenters who do odd jobs or odd jobs on the construction site, Party B will unconditionally provide arrangements and cooperation (big workers/workers, small workers/workers), and the work order will be signed and approved by both parties, and the expenses will be paid in one lump sum after completion and settlement.

4. Each team shall report the engineering quantity of that month on 28th of each month, and after being signed by the builder, it shall be reported to the project department according to the proportion stipulated in the contract. Each team must pay wages according to the personnel salary payment method formulated by the competent department of Wuhu City. The payroll shall be made by the team leader, signed by the worker himself, and distributed to people after being approved by the project leader.

Nine. Responsibilities of both parties:

1. Party A has the obligation to actively create good and necessary construction conditions for Party B, be responsible for providing design materials, construction drawings, atlas, technical verification and change sheets, provide technical disclosure sheets in time, assist in solving various difficulties encountered by Party B in the construction, and Party B will purchase materials by itself in time according to the progress of the project.

2. In the process of construction, Party A has the right to supervise and manage Party B in the whole process, according to

Party A has the right to punish Party B for violating the ISO-902 standard and Party A's management regulations, and Party B shall not refuse for any reason.

3. Party A must take full responsibility for Article 8 1 of this Agreement.

4. The person in charge of Party B's site must sign the notice, fine, rectification order, all kinds of consultation and relevant data sheets sent by Party A to Party B, and provide and fill in all kinds of statements and data required by Party A in time, otherwise Party A has the right to punish Party B. ..

5. All subdivisional works within the contracted scope of Party B belong to the warranty scope. During the warranty period, Party B shall complete the maintenance within three months after receiving the warranty notice from Party A; Otherwise, Party A will send someone to repair it by itself, and the expenses shall be borne by Party B. ..

6. Party B must pay the project payment to the workers on time. If Party B fails to implement it, Party A has the right to take compulsory measures to directly pay the laborer, and reserves the right to punish Party B. It is strictly forbidden for Party B to take the laborer to Party A's office to borrow money or ask for money, otherwise Party A has the right to severely punish Party B, and Party B must make a written commitment to Party A (which shall be handled at the time of signing the contract).

7. Any supplementary agreement to this contract shall be signed in writing after both parties reach an agreement through consultation, and shall be an integral part of this contract and have the same effect.

8. If Party B fails to meet the time limit and quality requirements, after Party A corrects it three times, Party A has the right to terminate the contract by itself, and Party B will leave immediately, and Party A will rearrange the team to enter the site. All the economic losses caused to Party A will be compensated by Party B, and only 70% of the engineering quantity completed by Party B will be settled.

X. Defaults, claims and disputes:

1. Any breach of contract, claims and disputes during the execution of this project shall be settled by Party A through consultation. If negotiation fails, a lawsuit may be brought to the local county (district) people's court.

2. During the performance of the contract, if one party breaches the contract, the breaching party shall compensate the other party 10% of the total price as liquidated damages.

3. Matters not covered in this contract shall be settled by both parties through negotiation.

XI。 Supplementary terms: Party A is responsible for coordinating and arranging the construction of various projects and assisting in solving contradictions and disputes among various projects.

This agreement is made in duplicate, one for each party, and shall come into force after being signed by both parties.

Party A (signature) and Party B (signature)

date month year

Woodworking construction contract 3

Party A: Party B:

According to the actual needs of the project, Party B is entrusted to subcontract the woodworking project. Based on the principle of seeking truth from facts and mutual benefit, Party A and Party B have reached the following agreement through consultation:

I. Scope of the Contract

All labor costs will be paid on the premise that the contractor does not include materials.

Second, the project price

The project price is calculated according to the actual completed template contact area; The basic part is calculated by 35 yuan/㎡. +/-0.00 or more per square meter.

Third, the mode of payment.

1, living expenses per person per month 1500 yuan.

2. The framework pays 70% in three installments.

3. Pay 80% for capping and 97% for completion acceptance. The balance will be paid in three months.

Fourth, the project quality

The project quality shall be constructed according to the requirements of drawing design, minutes of joint review, changes and construction specifications, reaching excellent standards, and eliminating quality hidden dangers and accidents.

Verb (abbreviation of verb) project progress

It can be completed according to the total contract schedule provided by Party A and the main project schedule and monthly ten-day plan formulated by Party A. If it is not completed, the consequences will be at your own risk. In the process of construction, it is necessary to clean up the materials. If it is unclear, Party A has the right to find someone to clean it up, and the salary shall be borne by Party B.. During the construction process, Party A must obey the arrangement, and those who don't listen will bear the consequences if they have any problems.

Six, if Party B can't finish, stop halfway, or people to affect the progress of the project, the project payment is calculated at 50% of the workload, and the consequences are at your own risk.

Seven. others

1. Matters not covered shall be settled by both parties through negotiation.

2. This contract is made in duplicate, one for Party B and one for Party A; This contract shall come into effect as of the date of signing. After living, the payment will be automatically invalidated.

Eight. supplement

Signature of Party A: Signature of Party B:

date month year

Three related articles on the model of woodworking construction contract;

★ 3 carpentry engineering contracts.

★ There are 3 model articles of woodworking engineering contract.

★ Standard Model of Woodworking Project Contract

★ There are three model clauses in the contract between woodworking contractor and material contractor.

★ Three contracts: woodworking contract and material contract.

★ 3 construction carpentry contracts

★ There are three model clauses in the service contract for decoration carpentry.

★ Woodworking construction contract template

★ Simple Woodworking Contract Template

★ 3 copies of labor contract of woodworking team.